Solar power plant, Illinois
Eldorado Solar II power plant, Illinois
Eldorado Solar II is a 120 MW solar power plant in Saline County, Illinois, operated by Sol Systems, and it generated 39,394 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 4th percentile of U.S. solar plants. By 2025 generation it ranks 4,384th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Eldorado Solar II plant run compared with other solar plants?
The Eldorado Solar II plant had a capacity factor of 4% in 2025 on 120 MW of net summer capacity, the 4th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 14 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Eldorado Solar II | 4% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Eldorado Solar II plant generating more or less than last year?
Eldorado Solar II generated 39,394 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 39,394 |
| 2026 through August | 192,962 |
Monthly generation, Oct 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 30,439 |
| July 2026 | 30,402 |
| June 2026 | 31,151 |
| May 2026 | 26,898 |
| April 2026 | 20,168 |
| March 2026 | 21,954 |
| February 2026 | 16,882 |
| January 2026 | 15,068 |
| December 2025 | 9,682 |
| November 2025 | 11,525 |
| October 2025 | 18,187 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Eldorado Solar II plant, and when do they retire?
1 operable generator totals 120 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 120 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ELD12 | Operating | Solar Photovoltaic | 120 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Eldorado Solar II plant?
EIA lists no joint owners for Eldorado Solar II. Sol Systems operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Eldorado Solar II plant?
Eldorado Solar II is in Eldorado, Saline County, Illinois, at 37.8688° N, 88.4259° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Illinois are similar in size?
Illinois has 406 operable solar plants with 4,387 MW of capacity, and Eldorado Solar II's 120 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Tilden Solar | Randolph | 150 | 25,874 |
| Big River Solar | White | 149 | 314,717 |
| Wolf Run Solar | Morgan | 140 | 314,470 |
| Eldorado Solar II | Saline | 120 | 39,394 |
| Hickory Solar | Jersey | 110 | 249,702 |
| High Point Solar LLC | Stephenson | 100 | 193,239 |
| Prairie State Solar Project | Perry | 99 | 220,366 |
Source: EIA Forms EIA-860 and EIA-923, 2025.