Solar power plant, Florida

High Springs Solar Power Plant, Florida

High Springs Solar Power Plant is a 74.9 MW solar power plant in Alachua County, Florida, operated by Duke Energy Florida, LLC, and it generated 164,928 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 65th percentile of U.S. solar plants. By 2025 generation it ranks 2,762nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.9 MWNameplate capacity
25%Capacity factor, 2025, 65th percentile, on 74.9 MW net summer
0.1%Of FL generation, 2025
2 yearsAverage generator age, by MW

How hard does High Springs Solar Power Plant run compared with other solar plants?

High Springs Solar Power Plant had a capacity factor of 25% in 2025 on 74.9 MW of net summer capacity, the 65th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
High Springs Solar Power Plant25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is High Springs Solar Power Plant generating more or less than last year?

Generation at High Springs Solar Power Plant rose 11.4% from 2024 to 2025, from 148,086 MWh to 164,928 MWh. Through August 2026 it is running 1.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024148,086
2025164,928
2026 through August118,471
2025, same months117,167
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202615,353
July 202617,856
June 202616,910
May 202615,026
April 202617,154
March 202615,301
February 202611,362
January 20269,509
December 20258,807
November 202512,174
October 202512,122
September 202514,658
August 202514,151
July 202516,359
June 202515,738
May 202516,991
April 202517,516
March 202515,656
February 202510,271
January 202510,485
December 20248,756
November 20249,889
October 202411,987
September 20249,556
August 202414,276
July 202414,434
June 202415,195
May 202416,111
April 202416,799
March 202413,106
February 202410,344
January 20247,633

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from High Springs Solar Power Plant?

High Springs Solar Power Plant made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 331 plants in Florida, the 3,131st largest of 14,327 in the U.S. and the 611th largest of 7,223 solar plants. By 2025 generation it is the 127th largest of 313 generating plants in the state.

High Springs Solar Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)164,928267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at High Springs Solar Power Plant, and when do they retire?

1 operable generator totals 74.9 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic752023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns High Springs Solar Power Plant?

EIA lists no joint owners for High Springs Solar Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of High Springs Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is High Springs Solar Power Plant?

High Springs Solar Power Plant is in High Springs, Alachua County, Florida, at 29.8100° N, 82.6398° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and High Springs Solar Power Plant's 74.9 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Fort Green Solar Power PlantHardee75165,855
Hildreth Solar Power PlantSuwannee75184,669
Bay Ranch Solar Power PlantBay75179,275
High Springs Solar Power PlantAlachua75164,928
Hardeetown Solar Power PlantLevy75165,565
Rice CreekPutnam75158,446
Mule Creek Renewable Energy CenterBay75189,537