Hildreth Solar Power Plant, Florida

Hildreth Solar Power Plant is a 74.9 MW solar power plant in Suwannee County, Florida, operated by Duke Energy Florida, LLC, and it generated 184,669 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 83rd percentile of U.S. solar plants. By 2025 generation it ranks 2,602nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.9 MWNameplate capacity
28%Capacity factor, 2025, 83rd percentile, on 74.9 MW net summer
0.1%Of FL generation, 2025
2 yearsAverage generator age, by MW

How hard does Hildreth Solar Power Plant run compared with other solar plants?

Hildreth Solar Power Plant had a capacity factor of 28% in 2025 on 74.9 MW of net summer capacity, the 83rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 103 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hildreth Solar Power Plant28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Hildreth Solar Power Plant generating more or less than last year?

Generation at Hildreth Solar Power Plant rose 9.6% from 2024 to 2025, from 168,481 MWh to 184,669 MWh. Through August 2026 it is running 11.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024168,481
2025184,669
2026 through August117,409
2025, same months132,708
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,778
July 202618,263
June 202617,413
May 202616,475
April 202617,167
March 202615,756
February 202612,443
January 202610,114
December 20259,318
November 202513,068
October 202513,201
September 202516,374
August 202516,527
July 202518,346
June 202517,694
May 202518,828
April 202520,759
March 202517,436
February 202511,445
January 202511,673
December 20249,769
November 202411,221
October 202413,980
September 202411,268
August 202418,035
July 202417,011
June 202418,436
May 202418,540
April 202418,296
March 202414,200
February 202410,482
January 20247,243

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Hildreth Solar Power Plant?

Hildreth Solar Power Plant made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 331 plants in Florida, the 3,131st largest of 14,327 in the U.S. and the 609th largest of 7,223 solar plants. By 2025 generation it is the 83rd largest of 313 generating plants in the state.

Hildreth Solar Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)184,669267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Hildreth Solar Power Plant, and when do they retire?

1 operable generator totals 74.9 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic752023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Hildreth Solar Power Plant?

EIA lists no joint owners for Hildreth Solar Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Hildreth Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Hildreth Solar Power Plant?

Hildreth Solar Power Plant is in O'Brien, Suwannee County, Florida, at 29.9648° N, 82.8232° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Hildreth Solar Power Plant's 74.9 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Bay Trail Solar Power PlantCitrus75163,460
Sandy Creek Solar Power PlantBay75166,565
Fort Green Solar Power PlantHardee75165,855
Hildreth Solar Power PlantSuwannee75184,669
Bay Ranch Solar Power PlantBay75179,275
High Springs Solar Power PlantAlachua75164,928
Hardeetown Solar Power PlantLevy75165,565

Source: EIA Forms EIA-860 and EIA-923, 2025.