Bay Trail Solar Power Plant is a 74.9 MW solar power plant in Citrus County, Florida, operated by Duke Energy Florida, LLC, and it generated 163,460 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 64th percentile of U.S. solar plants. By 2025 generation it ranks 2,778th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.9 MWNameplate capacity
25%Capacity factor, 2025, 64th percentile, on 74.9 MW net summer
0.1%Of FL generation, 2025
3 yearsAverage generator age, by MW

How hard does Bay Trail Solar Power Plant run compared with other solar plants?

Bay Trail Solar Power Plant had a capacity factor of 25% in 2025 on 74.9 MW of net summer capacity, the 64th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 91 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Bay Trail Solar Power Plant25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Bay Trail Solar Power Plant generating more or less than last year?

Generation at Bay Trail Solar Power Plant rose 12.7% from 2024 to 2025, from 145,002 MWh to 163,460 MWh. Through August 2026 it is running 3.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024145,002
2025163,460
2026 through August120,629
2025, same months116,511
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,001
July 202615,996
June 202616,920
May 202617,511
April 202616,689
March 202615,493
February 202611,879
January 202610,140
December 20259,291
November 202511,410
October 202512,238
September 202514,010
August 202514,233
July 202515,769
June 202516,455
May 202517,489
April 202519,131
March 202515,032
February 202510,941
January 20257,461
December 20247,708
November 202410,201
October 202411,749
September 20249,774
August 202413,593
July 202414,151
June 202416,111
May 202417,484
April 202416,332
March 20249,849
February 202410,230
January 20247,820

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Bay Trail Solar Power Plant?

Bay Trail Solar Power Plant made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 331 plants in Florida, the 3,131st largest of 14,327 in the U.S. and the 606th largest of 7,223 solar plants. By 2025 generation it is the 129th largest of 313 generating plants in the state.

Bay Trail Solar Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)163,460267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Bay Trail Solar Power Plant, and when do they retire?

1 operable generator totals 74.9 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic752022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Bay Trail Solar Power Plant?

EIA lists no joint owners for Bay Trail Solar Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Bay Trail Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Bay Trail Solar Power Plant?

Bay Trail Solar Power Plant is in Crystal River, Citrus County, Florida, at 29.0000° N, 82.6722° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Bay Trail Solar Power Plant's 74.9 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Santa Fe Solar Power PlantColumbia75155,978
Twin Rivers Solar Power PlantHamilton75166,044
Charlie Creek Solar Power PlantHardee75178,325
Bay Trail Solar Power PlantCitrus75163,460
Sandy Creek Solar Power PlantBay75166,565
Fort Green Solar Power PlantHardee75165,855
Hildreth Solar Power PlantSuwannee75184,669