Santa Fe Solar Power Plant is a 74.9 MW solar power plant in Columbia County, Florida, operated by Duke Energy Florida, LLC, and it generated 155,978 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 55th percentile of U.S. solar plants. By 2025 generation it ranks 2,843rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.9 MWNameplate capacity
24%Capacity factor, 2025, 55th percentile, on 74.9 MW net summer
0.1%Of FL generation, 2025
4 yearsAverage generator age, by MW

How hard does Santa Fe Solar Power Plant run compared with other solar plants?

Santa Fe Solar Power Plant had a capacity factor of 24% in 2025 on 74.9 MW of net summer capacity, the 55th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 87 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Santa Fe Solar Power Plant24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Santa Fe Solar Power Plant generating more or less than last year?

Generation at Santa Fe Solar Power Plant rose 6.4% from 2024 to 2025, from 146,638 MWh to 155,978 MWh. Through August 2026 it is running 23.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024146,638
2025155,978
2026 through August87,995
2025, same months114,653
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,575
July 202611,815
June 202613,429
May 20267,839
April 202612,192
March 202610,178
February 20267,181
January 20268,786
December 20258,633
November 20259,695
October 20257,751
September 202515,246
August 202515,420
July 202515,823
June 202514,504
May 202517,083
April 202517,871
March 202514,689
February 202510,061
January 20259,202
December 20248,261
November 20249,575
October 202411,574
September 202410,425
August 202414,451
July 202414,189
June 202415,856
May 202416,286
April 202415,660
March 202412,899
February 202410,921
January 20246,541

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Santa Fe Solar Power Plant?

Santa Fe Solar Power Plant made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 331 plants in Florida, the 3,131st largest of 14,327 in the U.S. and the 603rd largest of 7,223 solar plants. By 2025 generation it is the 141st largest of 313 generating plants in the state.

Santa Fe Solar Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)155,978267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Santa Fe Solar Power Plant, and when do they retire?

1 operable generator totals 74.9 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic752021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Santa Fe Solar Power Plant?

EIA lists no joint owners for Santa Fe Solar Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Santa Fe Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Santa Fe Solar Power Plant?

Santa Fe Solar Power Plant is in Fort White, Columbia County, Florida, at 29.8804° N, 82.7326° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Santa Fe Solar Power Plant's 74.9 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Hamilton Solar Power PlantHamilton75182,501
Columbia Solar Power PlantColumbia75161,265
Trenton Solar Power PlantGilchrist75173,677
Santa Fe Solar Power PlantColumbia75155,978
Twin Rivers Solar Power PlantHamilton75166,044
Charlie Creek Solar Power PlantHardee75178,325
Bay Trail Solar Power PlantCitrus75163,460

Source: EIA Forms EIA-860 and EIA-923, 2025.