Twin Rivers Solar Power Plant is a 74.9 MW solar power plant in Hamilton County, Florida, operated by Duke Energy Florida, LLC, and it generated 166,044 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 67th percentile of U.S. solar plants. By 2025 generation it ranks 2,752nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.9 MWNameplate capacity
25%Capacity factor, 2025, 67th percentile, on 74.9 MW net summer
0.1%Of FL generation, 2025
4 yearsAverage generator age, by MW

How hard does Twin Rivers Solar Power Plant run compared with other solar plants?

Twin Rivers Solar Power Plant had a capacity factor of 25% in 2025 on 74.9 MW of net summer capacity, the 67th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Twin Rivers Solar Power Plant25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Twin Rivers Solar Power Plant generating more or less than last year?

Generation at Twin Rivers Solar Power Plant rose 6.1% from 2024 to 2025, from 156,560 MWh to 166,044 MWh. Through August 2026 it is running 5.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024156,560
2025166,044
2026 through August111,992
2025, same months117,830
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202617,245
July 202617,615
June 202616,311
May 202614,145
April 202614,619
March 202614,797
February 20267,817
January 20269,443
December 20258,498
November 202511,527
October 202512,818
September 202515,371
August 202513,313
July 202517,834
June 202515,699
May 202516,868
April 202518,728
March 202515,953
February 20259,333
January 202510,102
December 20249,391
November 20249,919
October 202413,643
September 202410,431
August 202415,495
July 202415,156
June 202417,099
May 202415,847
April 202416,914
March 202413,551
February 202411,279
January 20247,835

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Twin Rivers Solar Power Plant?

Twin Rivers Solar Power Plant made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 331 plants in Florida, the 3,131st largest of 14,327 in the U.S. and the 604th largest of 7,223 solar plants. By 2025 generation it is the 121st largest of 313 generating plants in the state.

Twin Rivers Solar Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)166,044267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Twin Rivers Solar Power Plant, and when do they retire?

1 operable generator totals 74.9 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic752021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Twin Rivers Solar Power Plant?

EIA lists no joint owners for Twin Rivers Solar Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Twin Rivers Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Twin Rivers Solar Power Plant?

Twin Rivers Solar Power Plant is in Jasper, Hamilton County, Florida, at 30.4664° N, 82.9687° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Twin Rivers Solar Power Plant's 74.9 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Columbia Solar Power PlantColumbia75161,265
Trenton Solar Power PlantGilchrist75173,677
Santa Fe Solar Power PlantColumbia75155,978
Twin Rivers Solar Power PlantHamilton75166,044
Charlie Creek Solar Power PlantHardee75178,325
Bay Trail Solar Power PlantCitrus75163,460
Sandy Creek Solar Power PlantBay75166,565