Skip to main content
RateWatt

Solar power plant, Florida

Columbia Solar Power Plant, Florida

Columbia Solar Power Plant is a 74.9 MW solar power plant in Columbia County, Florida, operated by Duke Energy Florida, LLC, and it generated 161,265 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 2,797th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.9 MWNameplate capacity
25%Capacity factor, 2025, 61st percentile, on 74.9 MW net summer
0.1%Of FL generation, 2025
5 yearsAverage generator age, by MW

How hard does Columbia Solar Power Plant run compared with other solar plants?

Columbia Solar Power Plant had a capacity factor of 25% in 2025 on 74.9 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Columbia Solar Power Plant25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Columbia Solar Power Plant generating more or less than last year?

Generation at Columbia Solar Power Plant rose 8.0% from 2024 to 2025, from 149,305 MWh to 161,265 MWh. Through August 2026 it is running 1.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024149,305
2025161,265
2026 through August112,434
2025, same months113,591
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,515
July 202616,141
June 202616,508
May 202616,006
April 202614,615
March 202614,370
February 20268,923
January 20269,356
December 20258,901
November 202512,613
October 202511,192
September 202514,968
August 202516,050
July 202517,532
June 202511,810
May 202514,801
April 202517,950
March 202515,418
February 202510,417
January 20259,613
December 20248,385
November 20249,993
October 202412,508
September 20248,865
August 202415,505
July 202414,205
June 202416,990
May 202416,710
April 202415,730
March 202411,983
February 202410,421
January 20248,010

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Columbia Solar Power Plant?

Columbia Solar Power Plant made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 331 plants in Florida, the 3,131st largest of 14,327 in the U.S. and the 601st largest of 7,223 solar plants. By 2025 generation it is the 132nd largest of 313 generating plants in the state.

Columbia Solar Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)161,265267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Columbia Solar Power Plant, and when do they retire?

1 operable generator totals 74.9 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic752020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Columbia Solar Power Plant?

EIA lists no joint owners for Columbia Solar Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Columbia Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Columbia Solar Power Plant?

Columbia Solar Power Plant is in Fort White, Columbia County, Florida, at 29.8826° N, 82.6961° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Columbia Solar Power Plant's 74.9 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Whistling Duck ILevy75905
Hamilton Solar Power PlantHamilton75182,501
Columbia Solar Power PlantColumbia75161,265
Trenton Solar Power PlantGilchrist75173,677
Santa Fe Solar Power PlantColumbia75155,978
Twin Rivers Solar Power PlantHamilton75166,044

Source: EIA Forms EIA-860 and EIA-923, 2025.