Solar power plant, Florida
Columbia Solar Power Plant, Florida
Columbia Solar Power Plant is a 74.9 MW solar power plant in Columbia County, Florida, operated by Duke Energy Florida, LLC, and it generated 161,265 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 2,797th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Columbia Solar Power Plant run compared with other solar plants?
Columbia Solar Power Plant had a capacity factor of 25% in 2025 on 74.9 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Columbia Solar Power Plant | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Columbia Solar Power Plant generating more or less than last year?
Generation at Columbia Solar Power Plant rose 8.0% from 2024 to 2025, from 149,305 MWh to 161,265 MWh. Through August 2026 it is running 1.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 149,305 |
| 2025 | 161,265 |
| 2026 through August | 112,434 |
| 2025, same months | 113,591 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 16,515 |
| July 2026 | 16,141 |
| June 2026 | 16,508 |
| May 2026 | 16,006 |
| April 2026 | 14,615 |
| March 2026 | 14,370 |
| February 2026 | 8,923 |
| January 2026 | 9,356 |
| December 2025 | 8,901 |
| November 2025 | 12,613 |
| October 2025 | 11,192 |
| September 2025 | 14,968 |
| August 2025 | 16,050 |
| July 2025 | 17,532 |
| June 2025 | 11,810 |
| May 2025 | 14,801 |
| April 2025 | 17,950 |
| March 2025 | 15,418 |
| February 2025 | 10,417 |
| January 2025 | 9,613 |
| December 2024 | 8,385 |
| November 2024 | 9,993 |
| October 2024 | 12,508 |
| September 2024 | 8,865 |
| August 2024 | 15,505 |
| July 2024 | 14,205 |
| June 2024 | 16,990 |
| May 2024 | 16,710 |
| April 2024 | 15,730 |
| March 2024 | 11,983 |
| February 2024 | 10,421 |
| January 2024 | 8,010 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Columbia Solar Power Plant, and when do they retire?
1 operable generator totals 74.9 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 75 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV1 | Operating | Solar Photovoltaic | 75 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Columbia Solar Power Plant?
EIA lists no joint owners for Columbia Solar Power Plant. Duke Energy Florida, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Duke Energy Florida, LLC charge homes?
Duke Energy Florida, LLC, the operator of Columbia Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.
| Measure | Price | Monthly bill | Against Florida |
|---|---|---|---|
| Duke Energy Florida, LLC | 18.36¢ | $185 | 21% higher |
| Florida average | 15.21¢ | $168 | |
| U.S. average | 17.23¢ | $151 | 13% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is Columbia Solar Power Plant?
Columbia Solar Power Plant is in Fort White, Columbia County, Florida, at 29.8826° N, 82.6961° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Florida are similar in size?
Florida has 210 operable solar plants with 12,223 MW of capacity, and Columbia Solar Power Plant's 74.9 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Whistling Duck I | Levy | 75 | 905 |
| Hamilton Solar Power Plant | Hamilton | 75 | 182,501 |
| Columbia Solar Power Plant | Columbia | 75 | 161,265 |
| Trenton Solar Power Plant | Gilchrist | 75 | 173,677 |
| Santa Fe Solar Power Plant | Columbia | 75 | 155,978 |
| Twin Rivers Solar Power Plant | Hamilton | 75 | 166,044 |
Source: EIA Forms EIA-860 and EIA-923, 2025.