Trenton Solar Power Plant is a 74.9 MW solar power plant in Gilchrist County, Florida, operated by Duke Energy Florida, LLC, and it generated 173,677 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 74th percentile of U.S. solar plants. By 2025 generation it ranks 2,688th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.9 MWNameplate capacity
26%Capacity factor, 2025, 74th percentile, on 74.9 MW net summer
0.1%Of FL generation, 2025
6 yearsAverage generator age, by MW

How hard does Trenton Solar Power Plant run compared with other solar plants?

Trenton Solar Power Plant had a capacity factor of 26% in 2025 on 74.9 MW of net summer capacity, the 74th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Trenton Solar Power Plant26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Trenton Solar Power Plant generating more or less than last year?

Generation at Trenton Solar Power Plant rose 19.7% from 2024 to 2025, from 145,077 MWh to 173,677 MWh. Through August 2026 it is running 14.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024145,077
2025173,677
2026 through August106,919
2025, same months125,029
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20268,546
July 202616,744
June 202616,716
May 202616,633
April 202614,891
March 202612,551
February 202610,644
January 202610,194
December 20259,197
November 202512,288
October 202511,469
September 202515,694
August 202515,825
July 202517,307
June 202516,920
May 202518,584
April 202519,733
March 202516,339
February 202511,181
January 20259,140
December 20249,141
November 202410,548
October 202412,250
September 20249,118
August 202412,682
July 202414,614
June 202416,492
May 202416,654
April 202416,284
March 202412,706
February 20249,995
January 20244,593

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Trenton Solar Power Plant?

Trenton Solar Power Plant made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 331 plants in Florida, the 3,131st largest of 14,327 in the U.S. and the 602nd largest of 7,223 solar plants. By 2025 generation it is the 106th largest of 313 generating plants in the state.

Trenton Solar Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)173,677267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Trenton Solar Power Plant, and when do they retire?

1 operable generator totals 74.9 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic752019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Trenton Solar Power Plant?

EIA lists no joint owners for Trenton Solar Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Trenton Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Trenton Solar Power Plant?

Trenton Solar Power Plant is in Trenton, Gilchrist County, Florida, at 29.6351° N, 82.8431° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Trenton Solar Power Plant's 74.9 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Whistling Duck ILevy75905
Hamilton Solar Power PlantHamilton75182,501
Columbia Solar Power PlantColumbia75161,265
Trenton Solar Power PlantGilchrist75173,677
Santa Fe Solar Power PlantColumbia75155,978
Twin Rivers Solar Power PlantHamilton75166,044
Charlie Creek Solar Power PlantHardee75178,325