Fort Green Solar Power Plant is a 74.9 MW solar power plant in Hardee County, Florida, operated by Duke Energy Florida, LLC, and it generated 165,855 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 66th percentile of U.S. solar plants. By 2025 generation it ranks 2,754th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

74.9 MWNameplate capacity
25%Capacity factor, 2025, 66th percentile, on 74.9 MW net summer
0.1%Of FL generation, 2025
3 yearsAverage generator age, by MW

How hard does Fort Green Solar Power Plant run compared with other solar plants?

Fort Green Solar Power Plant had a capacity factor of 25% in 2025 on 74.9 MW of net summer capacity, the 66th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fort Green Solar Power Plant25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Fort Green Solar Power Plant generating more or less than last year?

Generation at Fort Green Solar Power Plant rose 4.4% from 2024 to 2025, from 158,931 MWh to 165,855 MWh. Through August 2026 it is running 3.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024158,931
2025165,855
2026 through August118,727
2025, same months114,547
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202615,315
July 202614,354
June 202615,487
May 202614,978
April 202616,582
March 202615,382
February 202613,576
January 202613,053
December 202512,366
November 202513,160
October 202513,187
September 202512,595
August 202513,979
July 202515,598
June 202514,055
May 202515,385
April 202516,923
March 202516,099
February 202511,549
January 202510,959
December 202411,185
November 202411,878
October 202411,570
September 202412,902
August 202413,240
July 202414,981
June 202413,968
May 202417,236
April 202416,703
March 202413,142
February 202413,132
January 20248,994

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Fort Green Solar Power Plant?

Fort Green Solar Power Plant made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 331 plants in Florida, the 3,131st largest of 14,327 in the U.S. and the 608th largest of 7,223 solar plants. By 2025 generation it is the 122nd largest of 313 generating plants in the state.

Fort Green Solar Power Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)7579,9360.1%
Generation (MWh)165,855267,867,7350.1%
Solar capacity (MW)7512,2230.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Fort Green Solar Power Plant, and when do they retire?

1 operable generator totals 74.9 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic752022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Fort Green Solar Power Plant?

EIA lists no joint owners for Fort Green Solar Power Plant. Duke Energy Florida, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Duke Energy Florida, LLC charge homes?

Duke Energy Florida, LLC, the operator of Fort Green Solar Power Plant, had an average residential price of 18.36¢ per kWh and an average bill of $185 a month in 2025, 21% above the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
Duke Energy Florida, LLC18.36¢$18521% higher
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Fort Green Solar Power Plant?

Fort Green Solar Power Plant is in Bowling Green, Hardee County, Florida, at 27.6411° N, 81.9416° W. It sits in the Duke Energy Florida Inc balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Florida are similar in size?

Florida has 210 operable solar plants with 12,223 MW of capacity, and Fort Green Solar Power Plant's 74.9 MW is 1% of that.

Solar plants in Florida around this size
PlantCountyMW2025 MWh
Charlie Creek Solar Power PlantHardee75178,325
Bay Trail Solar Power PlantCitrus75163,460
Sandy Creek Solar Power PlantBay75166,565
Fort Green Solar Power PlantHardee75165,855
Hildreth Solar Power PlantSuwannee75184,669
Bay Ranch Solar Power PlantBay75179,275
High Springs Solar Power PlantAlachua75164,928

Source: EIA Forms EIA-860 and EIA-923, 2025.