Highland North Wind Farm, Pennsylvania

Highland North Wind Farm is a 75 MW wind power plant in Cambria County, Pennsylvania, operated by Exus Pennsylvania Wind Holdings, and it generated 163,923 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Pennsylvania, and its capacity factor sits at the 22nd percentile of U.S. wind plants. By 2025 generation it ranks 2,773rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

75 MWNameplate capacity
25%Capacity factor, 2025, 22nd percentile, on 75 MW net summer
0.1%Of PA generation, 2025
13 yearsAverage generator age, by MW

How hard does the Highland North Wind Farm plant run compared with other wind plants?

The Highland North Wind Farm plant had a capacity factor of 25% in 2025 on 75 MW of net summer capacity, the 22nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 91 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Highland North Wind Farm25%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Highland North Wind Farm plant generating more or less than last year?

Generation at Highland North Wind Farm fell 5.3% from 2024 to 2025, from 173,016 MWh to 163,923 MWh.

Net generation by period
PeriodMWh
2024173,016
2025163,923
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202513,719
November 202519,396
October 202511,689
September 20254,710
August 20254,608
July 20253,835
June 20258,142
May 202514,844
April 202517,559
March 202523,371
February 202518,138
January 202523,912
December 202421,620
November 202420,095
October 202410,715
September 202411,051
August 20245,496
July 20246,681
June 20248,993
May 20249,165
April 202417,516
March 202423,922
February 202416,090
January 202421,672

Source: EIA Form EIA-923, through August 2026.

How much of Pennsylvania's electricity comes from the Highland North Wind Farm plant?

Highland North Wind Farm made 0.1% of the 245,706,645 MWh reported by Pennsylvania plants in 2025, from 0.1% of the state's 53,097 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 76th largest of 273 plants in Pennsylvania, the 3,097th largest of 14,327 in the U.S. and the 784th largest of 1,358 wind plants. By 2025 generation it is the 67th largest of 253 generating plants in the state.

Highland North Wind Farm within Pennsylvania, 2025
MeasureThis plantPennsylvaniaShare
Capacity (MW)7553,0970.1%
Generation (MWh)163,923245,706,6450.1%
Wind capacity (MW)751,5564.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Highland North Wind Farm plant, and when do they retire?

1 operable generator totals 75 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine752012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Highland North Wind Farm plant?

EIA lists no joint owners for Highland North Wind Farm. Exus Pennsylvania Wind Holdings operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Highland North Wind Farm plant?

Highland North Wind Farm is in Sidman, Cambria County, Pennsylvania, at 40.3196° N, 78.6806° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Pennsylvania are similar in size?

Pennsylvania has 27 operable wind plants with 1,556 MW of capacity, and Highland North Wind Farm's 75 MW is 5% of that.

Wind plants in Pennsylvania around this size
PlantCountyMW2025 MWh
Sandy Ridge Wind 2, LLCBlair88251,442
Allegheny Ridge Wind FarmCambria80199,219
North Allegheny Windpower ProjectBlair75217,942
Highland North Wind FarmCambria75163,923
Laurel Hill WindLycoming69122,720
Waymart WindWayne65103,269
Cambria Wind LLCCambria63128,224

Source: EIA Forms EIA-860 and EIA-923, 2025.