Wind power plant, Pennsylvania
North Allegheny Windpower Project, Pennsylvania
North Allegheny Windpower Project is a 75 MW wind power plant in Blair County, Pennsylvania, operated by Deriva Energy, and it generated 217,942 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Pennsylvania, and its capacity factor sits at the 51st percentile of U.S. wind plants. By 2025 generation it ranks 2,376th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the North Allegheny Windpower Project plant run compared with other wind plants?
The North Allegheny Windpower Project plant had a capacity factor of 33% in 2025 on 75 MW of net summer capacity, the 51st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 121 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| North Allegheny Windpower Project | 33% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the North Allegheny Windpower Project plant generating more or less than last year?
North Allegheny Windpower Project generated 217,942 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 9.8% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 125,042 |
| 2025 | 217,942 |
| 2026 through August | 141,355 |
| 2025, same months | 156,701 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 9,786 |
| July 2026 | 10,786 |
| June 2026 | 17,865 |
| May 2026 | 13,365 |
| April 2026 | 18,698 |
| March 2026 | 17,540 |
| February 2026 | 21,839 |
| January 2026 | 31,476 |
| December 2025 | 21,903 |
| November 2025 | 20,599 |
| October 2025 | 8,537 |
| September 2025 | 10,202 |
| August 2025 | 6,685 |
| July 2025 | 18,068 |
| June 2025 | 12,413 |
| May 2025 | 21,214 |
| April 2025 | 19,555 |
| March 2025 | 26,653 |
| February 2025 | 22,614 |
| January 2025 | 29,499 |
| December 2024 | 25,333 |
| November 2024 | 25,499 |
| October 2024 | 14,934 |
| September 2024 | 12,846 |
| August 2024 | 8,360 |
| July 2024 | 8,094 |
| June 2024 | 11,343 |
| May 2024 | 10,836 |
| April 2024 | 7,510 |
| March 2024 | 287 |
| February 2024 | 0 |
| January 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the North Allegheny Windpower Project plant, and when do they retire?
1 operable generator totals 75 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 75 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 75 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the North Allegheny Windpower Project plant?
Duke Energy DEGS North Allegheny is the only joint owner reported for North Allegheny Windpower Project, with 100.0%. Deriva Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the North Allegheny Windpower Project plant?
North Allegheny Windpower Project is in Lilly, Blair County, Pennsylvania, at 40.4381° N, 78.5436° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Pennsylvania are similar in size?
Pennsylvania has 27 operable wind plants with 1,556 MW of capacity, and North Allegheny Windpower Project's 75 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Big Level Wind | Potter | 90 | 298,316 |
| Sandy Ridge Wind 2, LLC | Blair | 88 | 251,442 |
| Allegheny Ridge Wind Farm | Cambria | 80 | 199,219 |
| North Allegheny Windpower Project | Blair | 75 | 217,942 |
| Highland North Wind Farm | Cambria | 75 | 163,923 |
| Laurel Hill Wind | Lycoming | 69 | 122,720 |
| Waymart Wind | Wayne | 65 | 103,269 |
Source: EIA Forms EIA-860 and EIA-923, 2025.