Skip to main content
RateWatt

Wind power plant, Pennsylvania

Sandy Ridge Wind 2, LLC power plant, Pennsylvania

Sandy Ridge Wind 2, LLC is a 87.6 MW wind power plant in Blair County, Pennsylvania, operated by Algonquin Power Co, and it generated 251,442 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Pennsylvania, and its capacity factor sits at the 50th percentile of U.S. wind plants. By 2025 generation it ranks 2,222nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

87.6 MWNameplate capacity
33%Capacity factor, 2025, 50th percentile, on 87.6 MW net summer
0.1%Of PA generation, 2025
2 yearsAverage generator age, by MW

How hard does the Sandy Ridge Wind 2, LLC plant run compared with other wind plants?

The Sandy Ridge Wind 2, LLC plant had a capacity factor of 33% in 2025 on 87.6 MW of net summer capacity, the 50th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 120 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sandy Ridge Wind 2, LLC33%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sandy Ridge Wind 2, LLC plant generating more or less than last year?

Generation at Sandy Ridge Wind 2, LLC rose 14.3% from 2024 to 2025, from 219,913 MWh to 251,442 MWh. Through August 2026 it is running 0.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024219,913
2025251,442
2026 through August167,205
2025, same months167,998
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20268,352
July 202614,895
June 202616,020
May 202619,233
April 202621,727
March 202624,678
February 202626,872
January 202635,428
December 202529,336
November 202529,432
October 202519,273
September 20255,403
August 20256,205
July 20257,191
June 202514,255
May 202522,629
April 202522,068
March 202533,020
February 202527,363
January 202535,267
December 202427,550
November 202427,983
October 202414,741
September 202412,398
August 202410,087
July 20248,337
June 202412,815
May 202411,602
April 202422,743
March 202429,532
February 202419,176
January 202422,949

Source: EIA Form EIA-923, through August 2026.

How much of Pennsylvania's electricity comes from the Sandy Ridge Wind 2, LLC plant?

Sandy Ridge Wind 2, LLC made 0.1% of the 245,706,645 MWh reported by Pennsylvania plants in 2025, from 0.2% of the state's 53,097 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 69th largest of 273 plants in Pennsylvania, the 2,882nd largest of 14,327 in the U.S. and the 733rd largest of 1,358 wind plants. By 2025 generation it is the 56th largest of 253 generating plants in the state.

Sandy Ridge Wind 2, LLC within Pennsylvania, 2025
MeasureThis plantPennsylvaniaShare
Capacity (MW)8853,0970.2%
Generation (MWh)251,442245,706,6450.1%
Wind capacity (MW)881,5565.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sandy Ridge Wind 2, LLC plant, and when do they retire?

1 operable generator totals 87.6 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s188100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SRW2OperatingOnshore Wind Turbine882023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sandy Ridge Wind 2, LLC plant?

EIA lists no joint owners for Sandy Ridge Wind 2, LLC. Algonquin Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sandy Ridge Wind 2, LLC plant?

Sandy Ridge Wind 2, LLC is in Tyrone, Blair County, Pennsylvania, at 40.7453° N, 78.2223° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Pennsylvania are similar in size?

Pennsylvania has 27 operable wind plants with 1,556 MW of capacity, and Sandy Ridge Wind 2, LLC's 87.6 MW is 6% of that.

Wind plants in Pennsylvania around this size
PlantCountyMW2025 MWh
Locust Ridge II LLCSchuylkill102198,680
Armenia Mountain Wind FarmTioga101265,176
Big Level WindPotter90298,316
Sandy Ridge Wind 2, LLCBlair88251,442
Allegheny Ridge Wind FarmCambria80199,219
North Allegheny Windpower ProjectBlair75217,942
Highland North Wind FarmCambria75163,923

Source: EIA Forms EIA-860 and EIA-923, 2025.