Wind power plant, Pennsylvania
Big Level Wind power plant, Pennsylvania
Big Level Wind is a 90 MW wind power plant in Potter County, Pennsylvania, operated by Big Level Wind LLC, and it generated 298,316 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Pennsylvania, and its capacity factor sits at the 66th percentile of U.S. wind plants. By 2025 generation it ranks 1,981st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Big Level Wind plant run compared with other wind plants?
The Big Level Wind plant had a capacity factor of 38% in 2025 on 90 MW of net summer capacity, the 66th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 138 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Big Level Wind | 38% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Big Level Wind plant generating more or less than last year?
Generation at Big Level Wind rose 17.7% from 2024 to 2025, from 253,419 MWh to 298,316 MWh. Through August 2026 it is running 5.8% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 253,419 |
| 2025 | 298,316 |
| 2026 through August | 183,480 |
| 2025, same months | 194,810 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 9,486 |
| July 2026 | 12,620 |
| June 2026 | 17,169 |
| May 2026 | 23,326 |
| April 2026 | 27,648 |
| March 2026 | 29,643 |
| February 2026 | 25,554 |
| January 2026 | 38,034 |
| December 2025 | 36,680 |
| November 2025 | 32,515 |
| October 2025 | 24,219 |
| September 2025 | 10,092 |
| August 2025 | 12,544 |
| July 2025 | 12,289 |
| June 2025 | 17,520 |
| May 2025 | 24,211 |
| April 2025 | 27,049 |
| March 2025 | 37,418 |
| February 2025 | 27,779 |
| January 2025 | 36,000 |
| December 2024 | 27,531 |
| November 2024 | 26,510 |
| October 2024 | 22,309 |
| September 2024 | 15,548 |
| August 2024 | 11,931 |
| July 2024 | 11,712 |
| June 2024 | 17,173 |
| May 2024 | 16,302 |
| April 2024 | 26,254 |
| March 2024 | 28,654 |
| February 2024 | 23,983 |
| January 2024 | 25,512 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Big Level Wind plant, and when do they retire?
1 operable generator totals 90 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 90 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BLW01 | Operating | Onshore Wind Turbine | 90 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Big Level Wind plant?
EIA lists no joint owners for Big Level Wind. Big Level Wind LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Big Level Wind plant?
Big Level Wind is in Hector Township, Potter County, Pennsylvania, at 41.8693° N, 77.6659° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Pennsylvania are similar in size?
Pennsylvania has 27 operable wind plants with 1,556 MW of capacity, and Big Level Wind's 90 MW is 6% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Twin Ridges Wind Farm | Somerset | 139 | 510,568 |
| Locust Ridge II LLC | Schuylkill | 102 | 198,680 |
| Armenia Mountain Wind Farm | Tioga | 101 | 265,176 |
| Big Level Wind | Potter | 90 | 298,316 |
| Sandy Ridge Wind 2, LLC | Blair | 88 | 251,442 |
| Allegheny Ridge Wind Farm | Cambria | 80 | 199,219 |
| North Allegheny Windpower Project | Blair | 75 | 217,942 |
Source: EIA Forms EIA-860 and EIA-923, 2025.