Skip to main content
RateWatt

Wind power plant, Iowa

Highland Wind Project, Iowa

Highland Wind Project (IA) is a 502 MW wind power plant in O'Brien County, Iowa, operated by MidAmerican Energy Co, and it generated 1,554,390 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.1% of the generation reported in Iowa, and its capacity factor sits at the 58th percentile of U.S. wind plants. By 2025 generation it ranks 589th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

502 MWNameplate capacity
35%Capacity factor, 2025, 58th percentile, on 500 MW net summer
2.1%Of IA generation, 2025
10 yearsAverage generator age, by MW

How hard does the Highland Wind Project (IA) plant run compared with other wind plants?

The Highland Wind Project (IA) plant had a capacity factor of 35% in 2025 on 500 MW of net summer capacity, the 58th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 130 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Highland Wind Project (IA)35%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Highland Wind Project (IA) plant generating more or less than last year?

Generation at Highland Wind Project (IA) fell 5.7% from 2024 to 2025, from 1,648,139 MWh to 1,554,390 MWh. Through August 2026 it is running 54.5% behind the same months of 2025.

Net generation by period
PeriodMWh
20241,648,139
20251,554,390
2026 through August502,884
2025, same months1,106,041
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202645,280
July 202638,209
June 202656,595
May 202655,646
April 202670,150
March 202671,748
February 202688,215
January 202677,041
December 2025126,739
November 202586,853
October 2025153,974
September 202580,783
August 202567,586
July 202571,807
June 2025105,892
May 2025125,161
April 2025197,038
March 2025195,462
February 2025156,852
January 2025186,243
December 2024134,908
November 2024143,275
October 2024181,352
September 2024116,850
August 202464,839
July 202463,554
June 202495,786
May 2024147,667
April 2024219,790
March 2024195,831
February 2024158,377
January 2024125,910

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Highland Wind Project (IA) plant?

Highland Wind Project (IA) made 2.1% of the 74,502,373 MWh reported by Iowa plants in 2025, from 2.0% of the state's 24,817 MW of capacity. By capacity it is the 9th largest of 306 plants in Iowa, the 727th largest of 14,327 in the U.S. and the 13th largest of 1,358 wind plants. By 2025 generation it is the 11th largest of 283 generating plants in the state.

Highland Wind Project (IA) within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)50224,8172.0%
Generation (MWh)1,554,39074,502,3732.1%
Wind capacity (MW)50213,4103.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Highland Wind Project (IA) plant, and when do they retire?

7 operable generators total 502 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s7502100%none reported
Every generator, 7 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HLWFOperatingOnshore Wind Turbine162015n/a
HLWF2OperatingOnshore Wind Turbine1012015n/a
HLWF3OperatingOnshore Wind Turbine892015n/a
HLWF4OperatingOnshore Wind Turbine892015n/a
HLWF5OperatingOnshore Wind Turbine1152015n/a
HLWF6OperatingOnshore Wind Turbine872015n/a
HLWF7OperatingOnshore Wind Turbine52015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Highland Wind Project (IA) plant?

EIA lists no joint owners for Highland Wind Project (IA). MidAmerican Energy Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does MidAmerican Energy Co charge homes?

MidAmerican Energy Co, the operator of Highland Wind Project (IA), had an average residential price of 11.21¢ per kWh and an average bill of $93 a month in 2025, 18% below the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
MidAmerican Energy Co11.21¢$9318% lower
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Highland Wind Project (IA) plant?

Highland Wind Project (IA) is in Primghar, O'Brien County, Iowa, at 43.0803° N, 95.6561° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Highland Wind Project (IA)'s 502 MW is 4% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Highland Wind Project (IA)O'Brien5021,554,390
Orient Wind FarmAdair5011,819,787
Rolling Hills Wind FarmCass4841,577,482
Beaver Creek WindBoone3401,258,157

Source: EIA Forms EIA-860 and EIA-923, 2025.