Wind power plant, Iowa
Intrepid wind power plant, Iowa
Intrepid is a 176 MW wind power plant in Buena Vista County, Iowa, operated by MidAmerican Energy Co, and it generated 546,415 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Iowa, and its capacity factor sits at the 58th percentile of U.S. wind plants. By 2025 generation it ranks 1,249th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Intrepid plant run compared with other wind plants?
The Intrepid plant had a capacity factor of 36% in 2025 on 176 MW of net summer capacity, the 58th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 130 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Intrepid | 36% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Intrepid plant generating more or less than last year?
Generation at Intrepid fell 0.5% from 2024 to 2025, from 549,404 MWh to 546,415 MWh.
| Period | MWh |
|---|---|
| 2024 | 549,404 |
| 2025 | 546,415 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 57,188 |
| November 2025 | 51,319 |
| October 2025 | 55,662 |
| September 2025 | 26,687 |
| August 2025 | 22,249 |
| July 2025 | 23,712 |
| June 2025 | 37,351 |
| May 2025 | 39,412 |
| April 2025 | 65,075 |
| March 2025 | 61,744 |
| February 2025 | 48,117 |
| January 2025 | 57,899 |
| December 2024 | 39,801 |
| November 2024 | 48,192 |
| October 2024 | 57,836 |
| September 2024 | 34,532 |
| August 2024 | 24,618 |
| July 2024 | 22,067 |
| June 2024 | 44,085 |
| May 2024 | 45,764 |
| April 2024 | 71,096 |
| March 2024 | 66,448 |
| February 2024 | 50,762 |
| January 2024 | 44,203 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Intrepid plant, and when do they retire?
2 operable generators total 176 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 176 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| INWF | Operating | Onshore Wind Turbine | 161 | 2004 | n/a |
| INWF2 | Operating | Onshore Wind Turbine | 15 | 2005 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Intrepid plant?
EIA lists no joint owners for Intrepid. MidAmerican Energy Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does MidAmerican Energy Co charge homes?
MidAmerican Energy Co, the operator of Intrepid, had an average residential price of 11.21¢ per kWh and an average bill of $93 a month in 2025, 18% below the Iowa average of 13.62¢.
| Measure | Price | Monthly bill | Against Iowa |
|---|---|---|---|
| MidAmerican Energy Co | 11.21¢ | $93 | 18% lower |
| Iowa average | 13.62¢ | $117 | |
| U.S. average | 17.23¢ | $151 | 26% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Intrepid plant?
Intrepid is in Schaller, Buena Vista County, Iowa, at 42.5539° N, 95.3283° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Iowa are similar in size?
Iowa has 123 operable wind plants with 13,410 MW of capacity, and Intrepid's 176 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Golden Plains | Winnebago | 200 | 736,798 |
| Whispering Willow Wind Farm - East | Franklin | 200 | 404,628 |
| Turtle Creek Wind Farm LLC | Mitchell | 199 | 719,859 |
| Intrepid | Buena Vista | 176 | 546,415 |
| Adair Wind Farm | Adair | 175 | 551,226 |
| English Farms | Poweshiek | 172 | 571,032 |
| Salt Creek Wind | Tama | 169 | 52,116 |
Source: EIA Forms EIA-860 and EIA-923, 2025.