Wind power plant, Iowa

Whispering Willow Wind Farm-East power plant, Iowa

Whispering Willow Wind Farm-East is a 200 MW wind power plant in Franklin County, Iowa, operated by Interstate Power and Light Co, and it generated 404,628 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Iowa, and its capacity factor sits at the 16th percentile of U.S. wind plants. By 2025 generation it ranks 1,576th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
23%Capacity factor, 2025, 16th percentile, on 200 MW net summer
0.5%Of IA generation, 2025
16 yearsAverage generator age, by MW

How hard does the Whispering Willow Wind Farm-East plant run compared with other wind plants?

The Whispering Willow Wind Farm-East plant had a capacity factor of 23% in 2025 on 200 MW of net summer capacity, the 16th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 84 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Whispering Willow Wind Farm-East23%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Whispering Willow Wind Farm-East plant generating more or less than last year?

Generation at Whispering Willow Wind Farm-East fell 4.8% from 2024 to 2025, from 425,170 MWh to 404,628 MWh.

Net generation by period
PeriodMWh
2024425,170
2025404,628
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202556,114
November 202541,813
October 202534,372
September 202517,332
August 202516,922
July 202517,164
June 202523,368
May 202515,848
April 202513,795
March 202535,387
February 202545,805
January 202586,708
December 202443,413
November 202434,483
October 202437,989
September 202426,174
August 202425,601
July 202419,267
June 202435,011
May 202430,894
April 202437,140
March 202447,006
February 202446,673
January 202441,519

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Whispering Willow Wind Farm-East plant?

Whispering Willow Wind Farm-East made 0.5% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.8% of the state's 24,817 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 41st largest of 306 plants in Iowa, the 1,640th largest of 14,327 in the U.S. and the 323rd largest of 1,358 wind plants. By 2025 generation it is the 56th largest of 283 generating plants in the state.

Whispering Willow Wind Farm-East within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)20024,8170.8%
Generation (MWh)404,62874,502,3730.5%
Wind capacity (MW)20013,4101.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Whispering Willow Wind Farm-East plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2002009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Whispering Willow Wind Farm-East plant?

EIA lists no joint owners for Whispering Willow Wind Farm-East. Interstate Power and Light Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Interstate Power and Light Co charge homes?

Interstate Power and Light Co, the operator of Whispering Willow Wind Farm-East, had an average residential price of 17.77¢ per kWh and an average bill of $131 a month in 2025, 30% above the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
Interstate Power and Light Co17.77¢$13130% higher
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Whispering Willow Wind Farm-East plant?

Whispering Willow Wind Farm-East is in Iowa Falls, Franklin County, Iowa, at 42.6305° N, 93.2064° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Whispering Willow Wind Farm-East's 200 MW is 1% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
FPL Energy Crystal Lake Wind II LLCHancock200721,542
Heartland Divide IIAudubon200798,264
Golden PlainsWinnebago200736,798
Whispering Willow Wind Farm - EastFranklin200404,628
Turtle Creek Wind Farm LLCMitchell199719,859
IntrepidBuena Vista176546,415
Adair Wind FarmAdair175551,226

Source: EIA Forms EIA-860 and EIA-923, 2025.