Skip to main content
RateWatt

Wind power plant, Texas

King Mountain Wind Ranch 1 power plant, Texas

King Mountain Wind Ranch 1 is a 278 MW wind power plant in Upton County, Texas, operated by FPL Energy Upton Wind LP, and it generated 573,485 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 17th percentile of U.S. wind plants. By 2025 generation it ranks 1,179th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

278 MWNameplate capacity
24%Capacity factor, 2025, 17th percentile, on 278 MW net summer
0.1%Of TX generation, 2025
24 yearsAverage generator age, by MW

How hard does the King Mountain Wind Ranch 1 plant run compared with other wind plants?

The King Mountain Wind Ranch 1 plant had a capacity factor of 24% in 2025 on 278 MW of net summer capacity, the 17th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 86 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
King Mountain Wind Ranch 124%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the King Mountain Wind Ranch 1 plant generating more or less than last year?

Generation at King Mountain Wind Ranch 1 rose 4.7% from 2024 to 2025, from 547,713 MWh to 573,485 MWh. Through August 2026 it is running 17.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024547,713
2025573,485
2026 through August431,954
2025, same months367,133
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202631,842
July 202657,364
June 202668,769
May 202654,578
April 202660,651
March 202665,960
February 202649,739
January 202643,051
December 202545,844
November 202551,697
October 202559,963
September 202548,848
August 202543,353
July 202547,035
June 202558,134
May 202541,413
April 202560,813
March 202553,508
February 202531,162
January 202531,715
December 202436,655
November 202442,783
October 202446,711
September 202430,778
August 202434,380
July 202440,182
June 202454,326
May 202440,446
April 202444,117
March 202462,909
February 202467,029
January 202447,397

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the King Mountain Wind Ranch 1 plant?

King Mountain Wind Ranch 1 made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 187th largest of 1,023 plants in Texas, the 1,153rd largest of 14,327 in the U.S. and the 113th largest of 1,358 wind plants. By 2025 generation it is the 230th largest of 816 generating plants in the state.

King Mountain Wind Ranch 1 within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)278195,9660.1%
Generation (MWh)573,485592,896,1760.1%
Wind capacity (MW)27843,9420.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the King Mountain Wind Ranch 1 plant, and when do they retire?

1 operable generator totals 278 MW, with an average age of 24 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s1278100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
EXISOperatingOnshore Wind Turbine2782001n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the King Mountain Wind Ranch 1 plant?

EIA lists no joint owners for King Mountain Wind Ranch 1. FPL Energy Upton Wind LP operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the King Mountain Wind Ranch 1 plant?

King Mountain Wind Ranch 1 is in McCamey, Upton County, Texas, at 31.2092° N, 102.2417° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and King Mountain Wind Ranch 1's 278 MW is 1% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Miami Wind Energy CenterRoberts289686,302
Pattern Gulf WindKenedy283758,541
Palo Duro WindOchiltree282839,408
King Mountain Wind Ranch 1Upton278573,485
Bethel Wind Farm LLCCastro2761,038,441
Las Majadas Wind FarmWillacy273851,354
Helena WindBee268750,170

Source: EIA Forms EIA-860 and EIA-923, 2025.