Wind power plant, Texas

Palo Duro Wind power plant, Texas

Palo Duro Wind is a 282 MW wind power plant in Ochiltree County, Texas, operated by Palo Duro Wind, and it generated 839,408 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 54th percentile of U.S. wind plants. By 2025 generation it ranks 843rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

282 MWNameplate capacity
34%Capacity factor, 2025, 54th percentile, on 282 MW net summer
0.1%Of TX generation, 2025
11 yearsAverage generator age, by MW

How hard does the Palo Duro Wind plant run compared with other wind plants?

The Palo Duro Wind plant had a capacity factor of 34% in 2025 on 282 MW of net summer capacity, the 54th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 124 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Palo Duro Wind34%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Palo Duro Wind plant generating more or less than last year?

Generation at Palo Duro Wind fell 17.4% from 2024 to 2025, from 1,016,222 MWh to 839,408 MWh. Through August 2026 it is running 114.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20241,016,222
2025839,408
2026 through August901,001
2025, same months420,057
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026113,737
July 2026106,015
June 2026115,821
May 2026112,557
April 2026126,559
March 2026128,098
February 202694,026
January 2026104,188
December 2025101,715
November 202599,503
October 2025117,462
September 2025100,671
August 202595,170
July 2025103,375
June 202555,157
May 202542,287
April 202531,846
March 202520,462
February 202532,317
January 202539,443
December 202436,021
November 202483,217
October 202491,285
September 202484,673
August 202474,754
July 202492,368
June 202498,193
May 202485,263
April 202499,883
March 2024103,566
February 202487,935
January 202479,064

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Palo Duro Wind plant?

Palo Duro Wind made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 186th largest of 1,023 plants in Texas, the 1,141st largest of 14,327 in the U.S. and the 111th largest of 1,358 wind plants. By 2025 generation it is the 147th largest of 816 generating plants in the state.

Palo Duro Wind within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)282195,9660.1%
Generation (MWh)839,408592,896,1760.1%
Wind capacity (MW)28243,9420.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Palo Duro Wind plant, and when do they retire?

1 operable generator totals 282 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1282100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GE1.7OperatingOnshore Wind Turbine2822014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Palo Duro Wind plant?

EIA lists no joint owners for Palo Duro Wind. Palo Duro Wind operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Palo Duro Wind plant?

Palo Duro Wind is in Perryton, Ochiltree County, Texas, at 36.2439° N, 101.0014° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Palo Duro Wind's 282 MW is 1% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Limestone Wind ProjectNavarro2991,043,979
Miami Wind Energy CenterRoberts289686,302
Pattern Gulf WindKenedy283758,541
Palo Duro WindOchiltree282839,408
King Mountain Wind Ranch 1Upton278573,485
Bethel Wind Farm LLCCastro2761,038,441
Las Majadas Wind FarmWillacy273851,354

Source: EIA Forms EIA-860 and EIA-923, 2025.