Wind power plant, Texas
Las Majadas Wind Farm, Texas
Las Majadas Wind Farm is a 273 MW wind power plant in Willacy County, Texas, operated by Las Majadas Wind Farm, LLC, and it generated 851,354 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 59th percentile of U.S. wind plants. By 2025 generation it ranks 834th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Las Majadas Wind Farm plant run compared with other wind plants?
The Las Majadas Wind Farm plant had a capacity factor of 36% in 2025 on 273 MW of net summer capacity, the 59th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 130 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Las Majadas Wind Farm | 36% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Las Majadas Wind Farm plant generating more or less than last year?
Generation at Las Majadas Wind Farm rose 2.1% from 2024 to 2025, from 833,731 MWh to 851,354 MWh. Through August 2026 it is running 10.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 833,731 |
| 2025 | 851,354 |
| 2026 through August | 584,677 |
| 2025, same months | 651,174 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 81,595 |
| July 2026 | 87,060 |
| June 2026 | 77,163 |
| May 2026 | 51,179 |
| April 2026 | 72,299 |
| March 2026 | 59,353 |
| February 2026 | 77,301 |
| January 2026 | 78,727 |
| December 2025 | 54,921 |
| November 2025 | 79,746 |
| October 2025 | 28,950 |
| September 2025 | 36,563 |
| August 2025 | 50,861 |
| July 2025 | 88,961 |
| June 2025 | 76,073 |
| May 2025 | 91,750 |
| April 2025 | 77,400 |
| March 2025 | 89,689 |
| February 2025 | 85,330 |
| January 2025 | 91,110 |
| December 2024 | 62,323 |
| November 2024 | 67,920 |
| October 2024 | 41,506 |
| September 2024 | 46,405 |
| August 2024 | 37,202 |
| July 2024 | 52,255 |
| June 2024 | 75,985 |
| May 2024 | 84,525 |
| April 2024 | 111,608 |
| March 2024 | 88,298 |
| February 2024 | 90,998 |
| January 2024 | 74,706 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Las Majadas Wind Farm plant, and when do they retire?
1 operable generator totals 273 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 273 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LMAJ | Operating | Onshore Wind Turbine | 273 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Las Majadas Wind Farm plant?
EIA lists no joint owners for Las Majadas Wind Farm. Las Majadas Wind Farm, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Las Majadas Wind Farm plant?
Las Majadas Wind Farm is in Santa Monica, Willacy County, Texas, at 26.3648° N, 97.5453° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Las Majadas Wind Farm's 273 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Palo Duro Wind | Ochiltree | 282 | 839,408 |
| King Mountain Wind Ranch 1 | Upton | 278 | 573,485 |
| Bethel Wind Farm LLC | Castro | 276 | 1,038,441 |
| Las Majadas Wind Farm | Willacy | 273 | 851,354 |
| Helena Wind | Bee | 268 | 750,170 |
| Goodnight | Armstrong | 266 | 723,621 |
| Wake Wind Energy Center | Crosby | 257 | 825,715 |
Source: EIA Forms EIA-860 and EIA-923, 2025.