Wind power plant, Texas

Las Majadas Wind Farm, Texas

Las Majadas Wind Farm is a 273 MW wind power plant in Willacy County, Texas, operated by Las Majadas Wind Farm, LLC, and it generated 851,354 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 59th percentile of U.S. wind plants. By 2025 generation it ranks 834th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

273 MWNameplate capacity
36%Capacity factor, 2025, 59th percentile, on 273 MW net summer
0.1%Of TX generation, 2025
4 yearsAverage generator age, by MW

How hard does the Las Majadas Wind Farm plant run compared with other wind plants?

The Las Majadas Wind Farm plant had a capacity factor of 36% in 2025 on 273 MW of net summer capacity, the 59th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 130 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Las Majadas Wind Farm36%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Las Majadas Wind Farm plant generating more or less than last year?

Generation at Las Majadas Wind Farm rose 2.1% from 2024 to 2025, from 833,731 MWh to 851,354 MWh. Through August 2026 it is running 10.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024833,731
2025851,354
2026 through August584,677
2025, same months651,174
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202681,595
July 202687,060
June 202677,163
May 202651,179
April 202672,299
March 202659,353
February 202677,301
January 202678,727
December 202554,921
November 202579,746
October 202528,950
September 202536,563
August 202550,861
July 202588,961
June 202576,073
May 202591,750
April 202577,400
March 202589,689
February 202585,330
January 202591,110
December 202462,323
November 202467,920
October 202441,506
September 202446,405
August 202437,202
July 202452,255
June 202475,985
May 202484,525
April 2024111,608
March 202488,298
February 202490,998
January 202474,706

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Las Majadas Wind Farm plant?

Las Majadas Wind Farm made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 191st largest of 1,023 plants in Texas, the 1,172nd largest of 14,327 in the U.S. and the 118th largest of 1,358 wind plants. By 2025 generation it is the 143rd largest of 816 generating plants in the state.

Las Majadas Wind Farm within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)273195,9660.1%
Generation (MWh)851,354592,896,1760.1%
Wind capacity (MW)27343,9420.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Las Majadas Wind Farm plant, and when do they retire?

1 operable generator totals 273 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1273100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
LMAJOperatingOnshore Wind Turbine2732021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Las Majadas Wind Farm plant?

EIA lists no joint owners for Las Majadas Wind Farm. Las Majadas Wind Farm, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Las Majadas Wind Farm plant?

Las Majadas Wind Farm is in Santa Monica, Willacy County, Texas, at 26.3648° N, 97.5453° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Las Majadas Wind Farm's 273 MW is 1% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Palo Duro WindOchiltree282839,408
King Mountain Wind Ranch 1Upton278573,485
Bethel Wind Farm LLCCastro2761,038,441
Las Majadas Wind FarmWillacy273851,354
Helena WindBee268750,170
GoodnightArmstrong266723,621
Wake Wind Energy CenterCrosby257825,715

Source: EIA Forms EIA-860 and EIA-923, 2025.