Wind power plant, Missouri
Kings Point Wind Energy Center, Missouri
Kings Point Wind Energy Center is a 149 MW wind power plant in Lawrence County, Missouri, operated by Empire District Electric Co, and it generated 502,606 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Missouri, and its capacity factor sits at the 71st percentile of U.S. wind plants. By 2025 generation it ranks 1,333rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Kings Point Wind Energy Center plant run compared with other wind plants?
The Kings Point Wind Energy Center plant had a capacity factor of 39% in 2025 on 146 MW of net summer capacity, the 71st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 144 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Kings Point Wind Energy Center | 39% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Kings Point Wind Energy Center plant generating more or less than last year?
Generation at Kings Point Wind Energy Center fell 12.3% from 2024 to 2025, from 573,205 MWh to 502,606 MWh. Through August 2026 it is running 17.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 573,205 |
| 2025 | 502,606 |
| 2026 through August | 386,646 |
| 2025, same months | 329,701 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 39,656 |
| July 2026 | 28,230 |
| June 2026 | 45,304 |
| May 2026 | 41,157 |
| April 2026 | 64,972 |
| March 2026 | 67,917 |
| February 2026 | 49,074 |
| January 2026 | 50,336 |
| December 2025 | 55,309 |
| November 2025 | 53,036 |
| October 2025 | 48,173 |
| September 2025 | 16,387 |
| August 2025 | 24,208 |
| July 2025 | 31,020 |
| June 2025 | 32,907 |
| May 2025 | 32,666 |
| April 2025 | 56,850 |
| March 2025 | 65,001 |
| February 2025 | 45,268 |
| January 2025 | 41,781 |
| December 2024 | 51,094 |
| November 2024 | 58,469 |
| October 2024 | 44,413 |
| September 2024 | 35,044 |
| August 2024 | 31,042 |
| July 2024 | 36,603 |
| June 2024 | 44,701 |
| May 2024 | 41,448 |
| April 2024 | 66,835 |
| March 2024 | 61,094 |
| February 2024 | 63,218 |
| January 2024 | 39,244 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Kings Point Wind Energy Center plant, and when do they retire?
1 operable generator totals 149 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 149 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| KPW1 | Operating | Onshore Wind Turbine | 149 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Kings Point Wind Energy Center plant?
EIA lists no joint owners for Kings Point Wind Energy Center. Empire District Electric Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Empire District Electric Co charge homes?
Empire District Electric Co, the operator of Kings Point Wind Energy Center, had an average residential price of 14.77¢ per kWh and an average bill of $154 a month in 2025, 11% above the Missouri average of 13.30¢.
| Measure | Price | Monthly bill | Against Missouri |
|---|---|---|---|
| Empire District Electric Co | 14.77¢ | $154 | 11% higher |
| Missouri average | 13.30¢ | $138 | |
| U.S. average | 17.23¢ | $151 | 30% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Kings Point Wind Energy Center plant?
Kings Point Wind Energy Center is in Golden City, Lawrence County, Missouri, at 37.2699° N, 94.0527° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Missouri are similar in size?
Missouri has 14 operable wind plants with 2,454 MW of capacity, and Kings Point Wind Energy Center's 149 MW is 6% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| White Cloud Wind Project, LLC | Nodaway | 237 | 828,191 |
| Osborn Wind Energy | DeKalb | 201 | 671,868 |
| Lost Creek Wind Energy Facility | DeKalb | 168 | 380,290 |
| Kings Point Wind Energy Center | Lawrence | 149 | 502,606 |
| North Fork Ridge Wind Energy Center | Barton | 149 | 489,788 |
| Farmers City Wind LLC | Atchison | 146 | 253,025 |
Source: EIA Forms EIA-860 and EIA-923, 2025.