Wind power plant, Missouri

Kings Point Wind Energy Center, Missouri

Kings Point Wind Energy Center is a 149 MW wind power plant in Lawrence County, Missouri, operated by Empire District Electric Co, and it generated 502,606 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Missouri, and its capacity factor sits at the 71st percentile of U.S. wind plants. By 2025 generation it ranks 1,333rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

149 MWNameplate capacity
39%Capacity factor, 2025, 71st percentile, on 146 MW net summer
0.7%Of MO generation, 2025
4 yearsAverage generator age, by MW

How hard does the Kings Point Wind Energy Center plant run compared with other wind plants?

The Kings Point Wind Energy Center plant had a capacity factor of 39% in 2025 on 146 MW of net summer capacity, the 71st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 144 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Kings Point Wind Energy Center39%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Kings Point Wind Energy Center plant generating more or less than last year?

Generation at Kings Point Wind Energy Center fell 12.3% from 2024 to 2025, from 573,205 MWh to 502,606 MWh. Through August 2026 it is running 17.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024573,205
2025502,606
2026 through August386,646
2025, same months329,701
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202639,656
July 202628,230
June 202645,304
May 202641,157
April 202664,972
March 202667,917
February 202649,074
January 202650,336
December 202555,309
November 202553,036
October 202548,173
September 202516,387
August 202524,208
July 202531,020
June 202532,907
May 202532,666
April 202556,850
March 202565,001
February 202545,268
January 202541,781
December 202451,094
November 202458,469
October 202444,413
September 202435,044
August 202431,042
July 202436,603
June 202444,701
May 202441,448
April 202466,835
March 202461,094
February 202463,218
January 202439,244

Source: EIA Form EIA-923, through August 2026.

How much of Missouri's electricity comes from the Kings Point Wind Energy Center plant?

Kings Point Wind Energy Center made 0.7% of the 71,443,096 MWh reported by Missouri plants in 2025, from 0.6% of the state's 23,215 MW of capacity. By capacity it is the 40th largest of 137 plants in Missouri, the 2,067th largest of 14,327 in the U.S. and the 483rd largest of 1,358 wind plants. By 2025 generation it is the 18th largest of 122 generating plants in the state.

Kings Point Wind Energy Center within Missouri, 2025
MeasureThis plantMissouriShare
Capacity (MW)14923,2150.6%
Generation (MWh)502,60671,443,0960.7%
Wind capacity (MW)1492,4546.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Kings Point Wind Energy Center plant, and when do they retire?

1 operable generator totals 149 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1149100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
KPW1OperatingOnshore Wind Turbine1492021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Kings Point Wind Energy Center plant?

EIA lists no joint owners for Kings Point Wind Energy Center. Empire District Electric Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Empire District Electric Co charge homes?

Empire District Electric Co, the operator of Kings Point Wind Energy Center, had an average residential price of 14.77¢ per kWh and an average bill of $154 a month in 2025, 11% above the Missouri average of 13.30¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Missouri
Empire District Electric Co14.77¢$15411% higher
Missouri average13.30¢$138
U.S. average17.23¢$15130% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Kings Point Wind Energy Center plant?

Kings Point Wind Energy Center is in Golden City, Lawrence County, Missouri, at 37.2699° N, 94.0527° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Missouri are similar in size?

Missouri has 14 operable wind plants with 2,454 MW of capacity, and Kings Point Wind Energy Center's 149 MW is 6% of that.

Wind plants in Missouri around this size
PlantCountyMW2025 MWh
White Cloud Wind Project, LLCNodaway237828,191
Osborn Wind EnergyDeKalb201671,868
Lost Creek Wind Energy FacilityDeKalb168380,290
Kings Point Wind Energy CenterLawrence149502,606
North Fork Ridge Wind Energy CenterBarton149489,788
Farmers City Wind LLCAtchison146253,025

Source: EIA Forms EIA-860 and EIA-923, 2025.