Solar power plant, Texas
Lumina Solar Project, Texas
Lumina Solar Project is a 487 MW power plant, 327 MW of it solar, in Scurry County, Texas, operated by Intersect USA, LLC, and it generated 679,860 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 61st percentile of U.S. solar plants. By 2025 generation it ranks 1,014th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lumina Solar Project plant run compared with other solar plants?
The Lumina Solar Project plant's solar units had a capacity factor of 24% in 2025 on 320 MW of net summer capacity, the 61st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 89 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lumina Solar Project | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Lumina Solar Project plant generating more or less than last year?
Generation at Lumina Solar Project fell 4.2% from 2024 to 2025, from 709,964 MWh to 679,860 MWh. Through August 2026 it is running 6.9% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 709,964 |
| 2025 | 679,860 |
| 2026 through August | 450,705 |
| 2025, same months | 484,072 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 89,324 |
| July 2026 | 91,171 |
| June 2026 | 54,361 |
| May 2026 | 58,570 |
| April 2026 | 39,515 |
| March 2026 | 42,444 |
| February 2026 | 41,909 |
| January 2026 | 33,411 |
| December 2025 | 35,104 |
| November 2025 | 41,068 |
| October 2025 | 52,037 |
| September 2025 | 67,579 |
| August 2025 | 81,034 |
| July 2025 | 83,275 |
| June 2025 | 61,730 |
| May 2025 | 78,215 |
| April 2025 | 47,261 |
| March 2025 | 47,467 |
| February 2025 | 43,454 |
| January 2025 | 41,636 |
| December 2024 | 40,398 |
| November 2024 | 38,299 |
| October 2024 | 57,406 |
| September 2024 | 63,541 |
| August 2024 | 79,408 |
| July 2024 | 86,648 |
| June 2024 | 55,145 |
| May 2024 | 72,724 |
| April 2024 | 60,592 |
| March 2024 | 63,986 |
| February 2024 | 51,950 |
| January 2024 | 39,867 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lumina Solar Project plant, and when do they retire?
2 operable generators total 487 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 487 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LUMIN | Operating | Solar Photovoltaic | 327 | 2024 | n/a |
| LU1BA | Operating | Batteries | 160 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lumina Solar Project plant?
EIA lists no joint owners for Lumina Solar Project. Intersect USA, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Lumina Solar Project plant use?
Lumina Solar Project has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 101% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 327 | 67.1% | 686,678 |
| Battery and pumped storage | 160 | 32.9% | -6,818 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Lumina Solar Project plant?
Lumina Solar Project is in Snyder, Scurry County, Texas, at 32.9011° N, 100.9827° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Lumina Solar Project's 327 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Five Wells Solar Center - Hybrid | Bell | 355 | 738,178 |
| Fagus Solar Park | Childress | 332 | n/a |
| Lumina II Solar Project | Scurry | 327 | 704,617 |
| Lumina Solar Project | Scurry | 327 | 686,678 |
| IP Radian, LLC | Brown | 320 | 657,714 |
| Delilah Solar Energy II LLC | Red River | 310 | 558,764 |
| BT Hickerson Solar, LLC | Bosque | 310 | 205,489 |
Source: EIA Forms EIA-860 and EIA-923, 2025.