Skip to main content
RateWatt

Solar power plant, Texas

Lumina II Solar Project, Texas

Lumina II Solar Project is a 487 MW power plant, 327 MW of it solar, in Scurry County, Texas, operated by Intersect USA, LLC, and it generated 700,168 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 65th percentile of U.S. solar plants. By 2025 generation it ranks 991st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

487 MWNameplate capacity
25%Capacity factor, 2025, solar units, 65th percentile, on 320 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Lumina II Solar Project plant run compared with other solar plants?

The Lumina II Solar Project plant's solar units had a capacity factor of 25% in 2025 on 320 MW of net summer capacity, the 65th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lumina II Solar Project25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Lumina II Solar Project plant generating more or less than last year?

Generation at Lumina II Solar Project rose 0.9% from 2024 to 2025, from 693,796 MWh to 700,168 MWh. Through August 2026 it is running 3.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024693,796
2025700,168
2026 through August521,069
2025, same months501,589
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202691,604
July 202689,183
June 202670,969
May 202672,531
April 202655,750
March 202654,929
February 202649,475
January 202636,628
December 202537,366
November 202543,523
October 202554,160
September 202563,530
August 202578,437
July 202576,469
June 202559,711
May 202581,516
April 202553,835
March 202558,216
February 202548,346
January 202545,059
December 202440,723
November 202442,719
October 202456,840
September 202463,916
August 202450,177
July 202483,514
June 202477,229
May 202468,430
April 202458,732
March 202462,612
February 202449,479
January 202439,425

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Lumina II Solar Project plant?

Lumina II Solar Project made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 100th largest of 1,023 plants in Texas, the 753rd largest of 14,327 in the U.S. and the 26th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 182nd largest of 816 generating plants in the state.

Lumina II Solar Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)487195,9660.2%
Generation (MWh)700,168592,896,1760.1%
Solar capacity (MW)32730,7391.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Lumina II Solar Project plant, and when do they retire?

2 operable generators total 487 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2487100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
LUMIIOperatingSolar Photovoltaic3272024n/a
LU2BAOperatingBatteries1602025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Lumina II Solar Project plant?

EIA lists no joint owners for Lumina II Solar Project. Intersect USA, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Lumina II Solar Project plant use?

Lumina II Solar Project has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar32767.1%704,617
Battery and pumped storage16032.9%-4,449

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Lumina II Solar Project plant?

Lumina II Solar Project is in Snyder, Scurry County, Texas, at 32.8835° N, 100.7464° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Lumina II Solar Project's 327 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Red Tailed Hawk Solar LLCWharton360763,536
Five Wells Solar Center - HybridBell355738,178
Fagus Solar ParkChildress332n/a
Lumina II Solar ProjectScurry327704,617
Lumina Solar ProjectScurry327686,678
IP Radian, LLCBrown320657,714
Delilah Solar Energy II LLCRed River310558,764