Solar power plant, Texas
Red Tailed Hawk Solar LLC power plant, Texas
Red Tailed Hawk Solar LLC is a 360 MW solar power plant in Wharton County, Texas, operated by Acciona Energy USA Global, LLC, and it generated 763,536 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 59th percentile of U.S. solar plants. By 2025 generation it ranks 920th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Red Tailed Hawk Solar LLC plant run compared with other solar plants?
The Red Tailed Hawk Solar LLC plant had a capacity factor of 24% in 2025 on 360 MW of net summer capacity, the 59th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 88 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Red Tailed Hawk Solar LLC | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Red Tailed Hawk Solar LLC plant generating more or less than last year?
Red Tailed Hawk Solar LLC generated 763,536 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 8.7% ahead of the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 221,453 |
| 2025 | 763,536 |
| 2026 through August | 558,025 |
| 2025, same months | 513,368 |
Monthly generation, Sep 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 90,432 |
| July 2026 | 85,541 |
| June 2026 | 78,145 |
| May 2026 | 76,950 |
| April 2026 | 52,629 |
| March 2026 | 62,693 |
| February 2026 | 61,919 |
| January 2026 | 49,716 |
| December 2025 | 41,611 |
| November 2025 | 56,867 |
| October 2025 | 72,287 |
| September 2025 | 79,403 |
| August 2025 | 76,954 |
| July 2025 | 75,576 |
| June 2025 | 70,767 |
| May 2025 | 79,273 |
| April 2025 | 71,320 |
| March 2025 | 63,116 |
| February 2025 | 39,868 |
| January 2025 | 36,494 |
| December 2024 | 40,358 |
| November 2024 | 45,041 |
| October 2024 | 71,954 |
| September 2024 | 64,100 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Red Tailed Hawk Solar LLC plant, and when do they retire?
1 operable generator totals 360 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 360 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Solar Photovoltaic | 360 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Red Tailed Hawk Solar LLC plant?
EIA lists no joint owners for Red Tailed Hawk Solar LLC. Acciona Energy USA Global, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Red Tailed Hawk Solar LLC plant?
Red Tailed Hawk Solar LLC is in El Campo, Wharton County, Texas, at 29.1592° N, 96.1416° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Red Tailed Hawk Solar LLC's 360 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Sequoia 1 | Eastland | 401 | 21,120 |
| Roadrunner, LLC Hybrid | Upton | 400 | 1,080,313 |
| Waco Solar | Limestone | 400 | 910,497 |
| Red Tailed Hawk Solar LLC | Wharton | 360 | 763,536 |
| Five Wells Solar Center - Hybrid | Bell | 355 | 738,178 |
| Fagus Solar Park | Childress | 332 | n/a |
| Lumina II Solar Project | Scurry | 327 | 704,617 |
Source: EIA Forms EIA-860 and EIA-923, 2025.