Solar power plant, Texas
Waco Solar power plant, Texas
Waco Solar is a 400 MW solar power plant in Limestone County, Texas, operated by Waco Solar, LLC, and it generated 910,497 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 71st percentile of U.S. solar plants. By 2025 generation it ranks 781st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Waco Solar plant run compared with other solar plants?
The Waco Solar plant had a capacity factor of 26% in 2025 on 400 MW of net summer capacity, the 71st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 95 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Waco Solar | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Waco Solar plant generating more or less than last year?
Waco Solar generated 910,497 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 10.9% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 779,137 |
| 2025 | 910,497 |
| 2026 through August | 575,683 |
| 2025, same months | 646,341 |
Monthly generation, Mar 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 111,368 |
| July 2026 | 113,221 |
| June 2026 | 93,698 |
| May 2026 | 39,285 |
| April 2026 | 55,347 |
| March 2026 | 44,223 |
| February 2026 | 69,471 |
| January 2026 | 49,070 |
| December 2025 | 43,829 |
| November 2025 | 63,361 |
| October 2025 | 81,674 |
| September 2025 | 75,292 |
| August 2025 | 94,571 |
| July 2025 | 92,743 |
| June 2025 | 99,409 |
| May 2025 | 89,817 |
| April 2025 | 80,403 |
| March 2025 | 75,430 |
| February 2025 | 57,316 |
| January 2025 | 56,652 |
| December 2024 | 48,261 |
| November 2024 | 59,770 |
| October 2024 | 90,849 |
| September 2024 | 84,892 |
| August 2024 | 101,860 |
| July 2024 | 102,206 |
| June 2024 | 118,959 |
| May 2024 | 62,442 |
| April 2024 | 70,520 |
| March 2024 | 39,378 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Waco Solar plant, and when do they retire?
1 operable generator totals 400 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 400 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SWACO | Operating | Solar Photovoltaic | 400 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Waco Solar plant?
EIA lists no joint owners for Waco Solar. Waco Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Waco Solar plant?
Waco Solar is in Mt Calm, Limestone County, Texas, at 31.7104° N, 96.8187° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Waco Solar's 400 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Ash Creek Solar | Hill | 409 | 405,591 |
| Sequoia 1 | Eastland | 401 | 21,120 |
| Roadrunner, LLC Hybrid | Upton | 400 | 1,080,313 |
| Waco Solar | Limestone | 400 | 910,497 |
| Red Tailed Hawk Solar LLC | Wharton | 360 | 763,536 |
| Five Wells Solar Center - Hybrid | Bell | 355 | 738,178 |
| Fagus Solar Park | Childress | 332 | n/a |
Source: EIA Forms EIA-860 and EIA-923, 2025.