Sequoia 1 is a 401 MW solar power plant in Eastland County, Texas, operated by Sequoia 1 Solar Project, and it generated 21,120 MWh in 2025 (Forms EIA-860 and EIA-923). By 2025 generation it ranks 5,175th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

401 MWNameplate capacity
under 1%Capacity factor, 2025, on 401 MW net summer
5,175thU.S. rank by generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Sequoia 1 plant run compared with other solar plants?

The Sequoia 1 plant had a capacity factor of under 1% in 2025 on 401 MW of net summer capacity, below nearly all of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sequoia 1under 1%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sequoia 1 plant generating more or less than last year?

Sequoia 1 generated 21,120 MWh in 2025; EIA reports no 2024 total to compare.

Net generation by period
PeriodMWh
2024n/a
202521,120
2026 through August681,842
Monthly generation, Dec 2025 to Aug 2026
MonthMWh
August 2026114,427
July 2026110,910
June 202696,767
May 202687,517
April 202678,373
March 202677,826
February 202666,550
January 202649,472
December 202521,120

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Sequoia 1 plant?

Sequoia 1 made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 128th largest of 1,023 plants in Texas, the 848th largest of 14,327 in the U.S. and the 18th largest of 7,223 solar plants. By 2025 generation it is the 573rd largest of 816 generating plants in the state.

Sequoia 1 within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)401195,9660.2%
Generation (MWh)21,120592,896,1760.0%
Solar capacity (MW)40130,7391.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sequoia 1 plant, and when do they retire?

1 operable generator totals 401 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1401100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SEQ1OperatingSolar Photovoltaic4012025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sequoia 1 plant?

EIA lists no joint owners for Sequoia 1. Sequoia 1 Solar Project operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sequoia 1 plant?

Sequoia 1 is in Cisco, Eastland County, Texas, at 32.4382° N, 99.1577° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Sequoia 1's 401 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Old 300 Solar Center, LLCFort Bend430901,599
2W Permian Solar Project HybridAndrews4201,007,398
Ash Creek SolarHill409405,591
Sequoia 1Eastland40121,120
Roadrunner, LLC HybridUpton4001,080,313
Waco SolarLimestone400910,497
Red Tailed Hawk Solar LLCWharton360763,536

Source: EIA Forms EIA-860 and EIA-923, 2025.