Solar power plant, Texas
Sequoia 1 solar power plant, Texas
Sequoia 1 is a 401 MW solar power plant in Eastland County, Texas, operated by Sequoia 1 Solar Project, and it generated 21,120 MWh in 2025 (Forms EIA-860 and EIA-923). By 2025 generation it ranks 5,175th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sequoia 1 plant run compared with other solar plants?
The Sequoia 1 plant had a capacity factor of under 1% in 2025 on 401 MW of net summer capacity, below nearly all of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. It ran for only a few hours of the year at full output.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sequoia 1 | under 1% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sequoia 1 plant generating more or less than last year?
Sequoia 1 generated 21,120 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 21,120 |
| 2026 through August | 681,842 |
Monthly generation, Dec 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 114,427 |
| July 2026 | 110,910 |
| June 2026 | 96,767 |
| May 2026 | 87,517 |
| April 2026 | 78,373 |
| March 2026 | 77,826 |
| February 2026 | 66,550 |
| January 2026 | 49,472 |
| December 2025 | 21,120 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sequoia 1 plant, and when do they retire?
1 operable generator totals 401 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 401 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SEQ1 | Operating | Solar Photovoltaic | 401 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sequoia 1 plant?
EIA lists no joint owners for Sequoia 1. Sequoia 1 Solar Project operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sequoia 1 plant?
Sequoia 1 is in Cisco, Eastland County, Texas, at 32.4382° N, 99.1577° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Sequoia 1's 401 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Old 300 Solar Center, LLC | Fort Bend | 430 | 901,599 |
| 2W Permian Solar Project Hybrid | Andrews | 420 | 1,007,398 |
| Ash Creek Solar | Hill | 409 | 405,591 |
| Sequoia 1 | Eastland | 401 | 21,120 |
| Roadrunner, LLC Hybrid | Upton | 400 | 1,080,313 |
| Waco Solar | Limestone | 400 | 910,497 |
| Red Tailed Hawk Solar LLC | Wharton | 360 | 763,536 |
Source: EIA Forms EIA-860 and EIA-923, 2025.