Solar power plant, Texas
2W Permian Solar Project Hybrid power plant, Texas
2W Permian Solar Project Hybrid is a 460 MW power plant, 420 MW of it solar, in Andrews County, Texas, operated by 2W Permian Solar, LLC, and it generated 1,005,292 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 79th percentile of U.S. solar plants. By 2025 generation it ranks 731st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the 2W Permian Solar Project Hybrid plant run compared with other solar plants?
The 2W Permian Solar Project Hybrid plant's solar units had a capacity factor of 27% in 2025 on 420 MW of net summer capacity, the 79th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| 2W Permian Solar Project Hybrid | 27% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the 2W Permian Solar Project Hybrid plant generating more or less than last year?
Generation at 2W Permian Solar Project Hybrid rose 10.7% from 2024 to 2025, from 908,415 MWh to 1,005,292 MWh. Through August 2026 it is running 2.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 908,415 |
| 2025 | 1,005,292 |
| 2026 through August | 724,839 |
| 2025, same months | 705,529 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 109,237 |
| July 2026 | 117,630 |
| June 2026 | 107,901 |
| May 2026 | 101,580 |
| April 2026 | 75,194 |
| March 2026 | 80,854 |
| February 2026 | 71,144 |
| January 2026 | 61,299 |
| December 2025 | 59,661 |
| November 2025 | 64,099 |
| October 2025 | 83,004 |
| September 2025 | 92,999 |
| August 2025 | 106,924 |
| July 2025 | 106,005 |
| June 2025 | 97,300 |
| May 2025 | 98,628 |
| April 2025 | 89,868 |
| March 2025 | 82,310 |
| February 2025 | 67,913 |
| January 2025 | 56,581 |
| December 2024 | 52,455 |
| November 2024 | 53,158 |
| October 2024 | 69,975 |
| September 2024 | 79,293 |
| August 2024 | 103,150 |
| July 2024 | 103,184 |
| June 2024 | 100,427 |
| May 2024 | 99,073 |
| April 2024 | 71,529 |
| March 2024 | 68,833 |
| February 2024 | 54,889 |
| January 2024 | 52,449 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the 2W Permian Solar Project Hybrid plant, and when do they retire?
2 operable generators total 460 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 460 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 2WPBA | Operating | Batteries | 40 | 2021 | n/a |
| 2WPSO | Operating | Solar Photovoltaic | 420 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the 2W Permian Solar Project Hybrid plant?
EIA lists no joint owners for 2W Permian Solar Project Hybrid. 2W Permian Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the 2W Permian Solar Project Hybrid plant use?
2W Permian Solar Project Hybrid has capacity on 2 fuels: 91% solar and 9% battery and pumped storage. In 2025, solar made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 420 | 91.3% | 1,007,398 |
| Battery and pumped storage | 40 | 8.7% | -2,106 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the 2W Permian Solar Project Hybrid plant?
2W Permian Solar Project Hybrid is in Andrews, Andrews County, Texas, at 32.1164° N, 102.5283° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and 2W Permian Solar Project Hybrid's 420 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Parliament Solar | Waller | 480 | 49,192 |
| Mockingbird Solar Center | Lamar | 471 | 928,383 |
| Old 300 Solar Center, LLC | Fort Bend | 430 | 901,599 |
| 2W Permian Solar Project Hybrid | Andrews | 420 | 1,007,398 |
| Ash Creek Solar | Hill | 409 | 405,591 |
| Sequoia 1 | Eastland | 401 | 21,120 |
| Roadrunner, LLC Hybrid | Upton | 400 | 1,080,313 |
Source: EIA Forms EIA-860 and EIA-923, 2025.