Solar power plant, Texas

2W Permian Solar Project Hybrid power plant, Texas

2W Permian Solar Project Hybrid is a 460 MW power plant, 420 MW of it solar, in Andrews County, Texas, operated by 2W Permian Solar, LLC, and it generated 1,005,292 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 79th percentile of U.S. solar plants. By 2025 generation it ranks 731st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

460 MWNameplate capacity
27%Capacity factor, 2025, solar units, 79th percentile, on 420 MW net summer
0.2%Of TX generation, 2025
4 yearsAverage generator age, by MW

How hard does the 2W Permian Solar Project Hybrid plant run compared with other solar plants?

The 2W Permian Solar Project Hybrid plant's solar units had a capacity factor of 27% in 2025 on 420 MW of net summer capacity, the 79th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
2W Permian Solar Project Hybrid27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the 2W Permian Solar Project Hybrid plant generating more or less than last year?

Generation at 2W Permian Solar Project Hybrid rose 10.7% from 2024 to 2025, from 908,415 MWh to 1,005,292 MWh. Through August 2026 it is running 2.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024908,415
20251,005,292
2026 through August724,839
2025, same months705,529
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026109,237
July 2026117,630
June 2026107,901
May 2026101,580
April 202675,194
March 202680,854
February 202671,144
January 202661,299
December 202559,661
November 202564,099
October 202583,004
September 202592,999
August 2025106,924
July 2025106,005
June 202597,300
May 202598,628
April 202589,868
March 202582,310
February 202567,913
January 202556,581
December 202452,455
November 202453,158
October 202469,975
September 202479,293
August 2024103,150
July 2024103,184
June 2024100,427
May 202499,073
April 202471,529
March 202468,833
February 202454,889
January 202452,449

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the 2W Permian Solar Project Hybrid plant?

2W Permian Solar Project Hybrid made 0.2% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 116th largest of 1,023 plants in Texas, the 784th largest of 14,327 in the U.S. and the 16th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 119th largest of 816 generating plants in the state.

2W Permian Solar Project Hybrid within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)460195,9660.2%
Generation (MWh)1,005,292592,896,1760.2%
Solar capacity (MW)42030,7391.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the 2W Permian Solar Project Hybrid plant, and when do they retire?

2 operable generators total 460 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2460100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
2WPBAOperatingBatteries402021n/a
2WPSOOperatingSolar Photovoltaic4202021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the 2W Permian Solar Project Hybrid plant?

EIA lists no joint owners for 2W Permian Solar Project Hybrid. 2W Permian Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the 2W Permian Solar Project Hybrid plant use?

2W Permian Solar Project Hybrid has capacity on 2 fuels: 91% solar and 9% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar42091.3%1,007,398
Battery and pumped storage408.7%-2,106

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the 2W Permian Solar Project Hybrid plant?

2W Permian Solar Project Hybrid is in Andrews, Andrews County, Texas, at 32.1164° N, 102.5283° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and 2W Permian Solar Project Hybrid's 420 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Parliament SolarWaller48049,192
Mockingbird Solar CenterLamar471928,383
Old 300 Solar Center, LLCFort Bend430901,599
2W Permian Solar Project HybridAndrews4201,007,398
Ash Creek SolarHill409405,591
Sequoia 1Eastland40121,120
Roadrunner, LLC HybridUpton4001,080,313

Source: EIA Forms EIA-860 and EIA-923, 2025.