Solar power plant, Texas
Parliament Solar power plant, Texas
Parliament Solar is a 480 MW solar power plant in Waller County, Texas, operated by Parliament Solar, LLC, and it generated 49,192 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 2nd percentile of U.S. solar plants. By 2025 generation it ranks 4,113th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Parliament Solar plant run compared with other solar plants?
The Parliament Solar plant had a capacity factor of 1% in 2025 on 480 MW of net summer capacity, the 2nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 4 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Parliament Solar | 1% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Parliament Solar plant generating more or less than last year?
Parliament Solar generated 49,192 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 49,192 |
| 2026 through August | 716,804 |
Monthly generation, Dec 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 112,284 |
| July 2026 | 106,789 |
| June 2026 | 88,209 |
| May 2026 | 102,077 |
| April 2026 | 75,651 |
| March 2026 | 96,494 |
| February 2026 | 73,846 |
| January 2026 | 61,454 |
| December 2025 | 49,192 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Parliament Solar plant, and when do they retire?
2 operable generators total 480 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 480 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PAR1 | Operating | Solar Photovoltaic | 241 | 2025 | n/a |
| PAR2 | Operating | Solar Photovoltaic | 239 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Parliament Solar plant?
EIA lists no joint owners for Parliament Solar. Parliament Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Parliament Solar plant?
Parliament Solar is in Waller, Waller County, Texas, at 29.9790° N, 95.9430° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Parliament Solar's 480 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Hecate Energy Outpost Solar LLC | Webb | 515 | 518,603 |
| Hecate Energy Frye Solar LLC | Swisher | 500 | 1,281,768 |
| Aktina Solar | Wharton | 500 | 930,128 |
| Parliament Solar | Waller | 480 | 49,192 |
| Mockingbird Solar Center | Lamar | 471 | 928,383 |
| Old 300 Solar Center, LLC | Fort Bend | 430 | 901,599 |
| 2W Permian Solar Project Hybrid | Andrews | 420 | 1,007,398 |
Source: EIA Forms EIA-860 and EIA-923, 2025.