Solar power plant, Texas
Hecate Energy Outpost Solar LLC power plant, Texas
Hecate Energy Outpost Solar LLC is a 515 MW solar power plant in Webb County, Texas, operated by Repsol Renewables NA, and it generated 518,603 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 8th percentile of U.S. solar plants. By 2025 generation it ranks 1,305th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Hecate Energy Outpost Solar LLC plant run compared with other solar plants?
The Hecate Energy Outpost Solar LLC plant had a capacity factor of 11% in 2025 on 515 MW of net summer capacity, the 8th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 42 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Hecate Energy Outpost Solar LLC | 11% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Hecate Energy Outpost Solar LLC plant generating more or less than last year?
Hecate Energy Outpost Solar LLC generated 518,603 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 526.5% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 518,603 |
| 2026 through August | 852,990 |
| 2025, same months | 136,155 |
Monthly generation, Aug 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 137,676 |
| July 2026 | 135,639 |
| June 2026 | 118,336 |
| May 2026 | 112,923 |
| April 2026 | 81,864 |
| March 2026 | 112,861 |
| February 2026 | 86,256 |
| January 2026 | 67,435 |
| December 2025 | 60,870 |
| November 2025 | 114,433 |
| October 2025 | 95,890 |
| September 2025 | 111,255 |
| August 2025 | 136,155 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Hecate Energy Outpost Solar LLC plant, and when do they retire?
1 operable generator totals 515 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 515 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RROS | Operating | Solar Photovoltaic | 515 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Hecate Energy Outpost Solar LLC plant?
EIA lists no joint owners for Hecate Energy Outpost Solar LLC. Repsol Renewables NA operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Hecate Energy Outpost Solar LLC plant?
Hecate Energy Outpost Solar LLC is in Laredo, Webb County, Texas, at 27.8592° N, 99.1617° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Hecate Energy Outpost Solar LLC's 515 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Hornet Solar (TX) | Swisher | 600 | 1,216,166 |
| Hecate Energy Outpost Solar LLC | Webb | 515 | 518,603 |
| Hecate Energy Frye Solar LLC | Swisher | 500 | 1,281,768 |
| Aktina Solar | Wharton | 500 | 930,128 |
| Parliament Solar | Waller | 480 | 49,192 |
Source: EIA Forms EIA-860 and EIA-923, 2025.