Solar power plant, Texas

Hornet Solar power plant, Texas

Hornet Solar (TX) is a 600 MW solar power plant in Swisher County, Texas, operated by Vesper Energy Development LLC, and it generated 1,216,166 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 50th percentile of U.S. solar plants. By 2025 generation it ranks 657th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

600 MWNameplate capacity
23%Capacity factor, 2025, 50th percentile, on 600 MW net summer
0.2%Of TX generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Hornet Solar (TX) plant run compared with other solar plants?

The Hornet Solar (TX) plant had a capacity factor of 23% in 2025 on 600 MW of net summer capacity, the 50th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 84 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hornet Solar (TX)23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hornet Solar (TX) plant generating more or less than last year?

Hornet Solar (TX) generated 1,216,166 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 52.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
20251,216,166
2026 through August1,185,992
2025, same months778,678
Monthly generation, Apr 2025 to Aug 2026
MonthMWh
August 2026167,673
July 2026176,628
June 2026162,288
May 2026164,053
April 2026161,073
March 2026144,056
February 2026117,150
January 202693,071
December 202593,386
November 202597,210
October 2025114,032
September 2025132,860
August 2025154,106
July 2025162,014
June 2025157,331
May 2025170,138
April 2025135,089

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Hornet Solar (TX) plant?

Hornet Solar (TX) made 0.2% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.3% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 73rd largest of 1,023 plants in Texas, the 604th largest of 14,327 in the U.S. and the 2nd largest of 7,223 solar plants. By 2025 generation it is the 97th largest of 816 generating plants in the state.

Hornet Solar (TX) within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)600195,9660.3%
Generation (MWh)1,216,166592,896,1760.2%
Solar capacity (MW)60030,7392.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hornet Solar (TX) plant, and when do they retire?

1 operable generator totals 600 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1600100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HRNETOperatingSolar Photovoltaic6002025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hornet Solar (TX) plant?

EIA lists no joint owners for Hornet Solar (TX). Vesper Energy Development LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hornet Solar (TX) plant?

Hornet Solar (TX) is in Tulia, Swisher County, Texas, at 34.4852° N, 101.9714° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Hornet Solar (TX)'s 600 MW is 2% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Hornet Solar (TX)Swisher6001,216,166
Hecate Energy Outpost Solar LLCWebb515518,603
Hecate Energy Frye Solar LLCSwisher5001,281,768
Aktina SolarWharton500930,128

Source: EIA Forms EIA-860 and EIA-923, 2025.