Solar power plant, Texas
Hornet Solar power plant, Texas
Hornet Solar (TX) is a 600 MW solar power plant in Swisher County, Texas, operated by Vesper Energy Development LLC, and it generated 1,216,166 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 50th percentile of U.S. solar plants. By 2025 generation it ranks 657th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Hornet Solar (TX) plant run compared with other solar plants?
The Hornet Solar (TX) plant had a capacity factor of 23% in 2025 on 600 MW of net summer capacity, the 50th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 84 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Hornet Solar (TX) | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Hornet Solar (TX) plant generating more or less than last year?
Hornet Solar (TX) generated 1,216,166 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 52.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 1,216,166 |
| 2026 through August | 1,185,992 |
| 2025, same months | 778,678 |
Monthly generation, Apr 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 167,673 |
| July 2026 | 176,628 |
| June 2026 | 162,288 |
| May 2026 | 164,053 |
| April 2026 | 161,073 |
| March 2026 | 144,056 |
| February 2026 | 117,150 |
| January 2026 | 93,071 |
| December 2025 | 93,386 |
| November 2025 | 97,210 |
| October 2025 | 114,032 |
| September 2025 | 132,860 |
| August 2025 | 154,106 |
| July 2025 | 162,014 |
| June 2025 | 157,331 |
| May 2025 | 170,138 |
| April 2025 | 135,089 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Hornet Solar (TX) plant, and when do they retire?
1 operable generator totals 600 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 600 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HRNET | Operating | Solar Photovoltaic | 600 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Hornet Solar (TX) plant?
EIA lists no joint owners for Hornet Solar (TX). Vesper Energy Development LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Hornet Solar (TX) plant?
Hornet Solar (TX) is in Tulia, Swisher County, Texas, at 34.4852° N, 101.9714° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Hornet Solar (TX)'s 600 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Hornet Solar (TX) | Swisher | 600 | 1,216,166 |
| Hecate Energy Outpost Solar LLC | Webb | 515 | 518,603 |
| Hecate Energy Frye Solar LLC | Swisher | 500 | 1,281,768 |
| Aktina Solar | Wharton | 500 | 930,128 |
Source: EIA Forms EIA-860 and EIA-923, 2025.