Aktina Solar power plant, Texas

Aktina Solar is a 500 MW solar power plant in Wharton County, Texas, operated by Hecate Energy Ramsey, LLC, and it generated 930,128 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 34th percentile of U.S. solar plants. By 2025 generation it ranks 769th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

500 MWNameplate capacity
21%Capacity factor, 2025, 34th percentile, on 500 MW net summer
0.2%Of TX generation, 2025
2 yearsAverage generator age, by MW

How hard does the Aktina Solar plant run compared with other solar plants?

The Aktina Solar plant had a capacity factor of 21% in 2025 on 500 MW of net summer capacity, the 34th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Aktina Solar21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Aktina Solar plant generating more or less than last year?

Generation at Aktina Solar fell 3.9% from 2024 to 2025, from 967,532 MWh to 930,128 MWh. Through August 2026 it is running 22.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024967,532
2025930,128
2026 through August729,281
2025, same months593,983
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026118,833
July 2026112,351
June 2026104,831
May 2026104,898
April 202675,448
March 2026104,897
February 202650,221
January 202657,802
December 202555,771
November 202575,373
October 202596,190
September 2025108,811
August 2025114,078
July 2025112,481
June 2025106,490
May 202578,551
April 202574,732
March 202569,825
February 20253,044
January 202534,782
December 202445,473
November 202467,398
October 202498,678
September 202496,496
August 2024117,595
July 202494,433
June 2024119,427
May 202485,508
April 202481,205
March 202458,259
February 202457,821
January 202445,239

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Aktina Solar plant?

Aktina Solar made 0.2% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.3% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 94th largest of 1,023 plants in Texas, the 733rd largest of 14,327 in the U.S. and the 10th largest of 7,223 solar plants. By 2025 generation it is the 127th largest of 816 generating plants in the state.

Aktina Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)500195,9660.3%
Generation (MWh)930,128592,896,1760.2%
Solar capacity (MW)50030,7391.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Aktina Solar plant, and when do they retire?

1 operable generator totals 500 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1500100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
AKS01OperatingSolar Photovoltaic5002023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Aktina Solar plant?

EIA lists no joint owners for Aktina Solar. Hecate Energy Ramsey, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Aktina Solar plant?

Aktina Solar is in El Campo, Wharton County, Texas, at 29.1220° N, 96.2760° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Aktina Solar's 500 MW is 2% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Hornet Solar (TX)Swisher6001,216,166
Hecate Energy Outpost Solar LLCWebb515518,603
Hecate Energy Frye Solar LLCSwisher5001,281,768
Aktina SolarWharton500930,128
Parliament SolarWaller48049,192
Mockingbird Solar CenterLamar471928,383
Old 300 Solar Center, LLCFort Bend430901,599

Source: EIA Forms EIA-860 and EIA-923, 2025.