Mockingbird Solar Center, Texas
Mockingbird Solar Center is a 471 MW solar power plant in Lamar County, Texas, operated by Mockingbird Solar Center, LLC, and it generated 928,383 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 45th percentile of U.S. solar plants. By 2025 generation it ranks 771st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Mockingbird Solar Center plant run compared with other solar plants?
The Mockingbird Solar Center plant had a capacity factor of 23% in 2025 on 471 MW of net summer capacity, the 45th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 82 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Mockingbird Solar Center | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Mockingbird Solar Center plant generating more or less than last year?
Mockingbird Solar Center generated 928,383 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 14.1% ahead of the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 490,563 |
| 2025 | 928,383 |
| 2026 through August | 733,859 |
| 2025, same months | 642,992 |
Monthly generation, Apr 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 116,560 |
| July 2026 | 118,143 |
| June 2026 | 114,624 |
| May 2026 | 99,253 |
| April 2026 | 71,000 |
| March 2026 | 87,643 |
| February 2026 | 70,279 |
| January 2026 | 56,357 |
| December 2025 | 44,686 |
| November 2025 | 60,132 |
| October 2025 | 84,996 |
| September 2025 | 95,577 |
| August 2025 | 98,801 |
| July 2025 | 102,442 |
| June 2025 | 98,935 |
| May 2025 | 74,877 |
| April 2025 | 69,661 |
| March 2025 | 86,796 |
| February 2025 | 54,531 |
| January 2025 | 56,949 |
| December 2024 | 43,363 |
| November 2024 | 59,095 |
| October 2024 | 94,965 |
| September 2024 | 80,103 |
| August 2024 | 86,919 |
| July 2024 | 66,711 |
| June 2024 | 38,875 |
| May 2024 | 19,282 |
| April 2024 | 1,250 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Mockingbird Solar Center plant, and when do they retire?
1 operable generator totals 471 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 471 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 7777 | Operating | Solar Photovoltaic | 471 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Mockingbird Solar Center plant?
EIA lists no joint owners for Mockingbird Solar Center. Mockingbird Solar Center, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Mockingbird Solar Center plant?
Mockingbird Solar Center is in Brookston, Lamar County, Texas, at 33.3917° N, 95.4252° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Mockingbird Solar Center's 471 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Hecate Energy Frye Solar LLC | Swisher | 500 | 1,281,768 |
| Aktina Solar | Wharton | 500 | 930,128 |
| Parliament Solar | Waller | 480 | 49,192 |
| Mockingbird Solar Center | Lamar | 471 | 928,383 |
| Old 300 Solar Center, LLC | Fort Bend | 430 | 901,599 |
| 2W Permian Solar Project Hybrid | Andrews | 420 | 1,007,398 |
| Ash Creek Solar | Hill | 409 | 405,591 |
Source: EIA Forms EIA-860 and EIA-923, 2025.