Hecate Energy Frye Solar LLC power plant, Texas

Hecate Energy Frye Solar LLC is a 500 MW solar power plant in Swisher County, Texas, operated by Repsol Renewables NA, and it generated 1,281,768 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 88th percentile of U.S. solar plants. By 2025 generation it ranks 640th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

500 MWNameplate capacity
29%Capacity factor, 2025, 88th percentile, on 500 MW net summer
0.2%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Hecate Energy Frye Solar LLC plant run compared with other solar plants?

The Hecate Energy Frye Solar LLC plant had a capacity factor of 29% in 2025 on 500 MW of net summer capacity, the 88th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 107 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hecate Energy Frye Solar LLC29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hecate Energy Frye Solar LLC plant generating more or less than last year?

Hecate Energy Frye Solar LLC generated 1,281,768 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.3% ahead of the same months of 2025. 2024 has output for only 7 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024801,331
20251,281,768
2026 through August953,810
2025, same months923,580
Monthly generation, Jun 2024 to Aug 2026
MonthMWh
August 2026147,551
July 2026146,608
June 2026131,258
May 2026135,611
April 2026113,300
March 2026116,381
February 202694,194
January 202668,907
December 202574,933
November 202580,645
October 202589,911
September 2025112,699
August 2025124,998
July 2025137,931
June 2025131,205
May 2025140,977
April 2025106,243
March 2025115,079
February 202586,918
January 202580,229
December 202472,807
November 202478,624
October 2024102,299
September 2024120,689
August 2024148,277
July 2024148,117
June 2024130,518

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Hecate Energy Frye Solar LLC plant?

Hecate Energy Frye Solar LLC made 0.2% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.3% of the state's 195,966 MW of capacity. By capacity it is the 94th largest of 1,023 plants in Texas, the 733rd largest of 14,327 in the U.S. and the 9th largest of 7,223 solar plants. By 2025 generation it is the 92nd largest of 816 generating plants in the state.

Hecate Energy Frye Solar LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)500195,9660.3%
Generation (MWh)1,281,768592,896,1760.2%
Solar capacity (MW)50030,7391.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hecate Energy Frye Solar LLC plant, and when do they retire?

1 operable generator totals 500 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1500100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
80995OperatingSolar Photovoltaic5002024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hecate Energy Frye Solar LLC plant?

EIA lists no joint owners for Hecate Energy Frye Solar LLC. Repsol Renewables NA operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hecate Energy Frye Solar LLC plant?

Hecate Energy Frye Solar LLC is in Kress, Swisher County, Texas, at 34.4067° N, 101.5966° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Hecate Energy Frye Solar LLC's 500 MW is 2% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Hornet Solar (TX)Swisher6001,216,166
Hecate Energy Outpost Solar LLCWebb515518,603
Hecate Energy Frye Solar LLCSwisher5001,281,768
Aktina SolarWharton500930,128
Parliament SolarWaller48049,192
Mockingbird Solar CenterLamar471928,383

Source: EIA Forms EIA-860 and EIA-923, 2025.