Solar power plant, Texas
Ash Creek Solar power plant, Texas
Ash Creek Solar is a 409 MW solar power plant in Hill County, Texas, operated by Ash Creek, and it generated 405,591 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 8th percentile of U.S. solar plants. By 2025 generation it ranks 1,574th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Ash Creek Solar plant run compared with other solar plants?
The Ash Creek Solar plant had a capacity factor of 11% in 2025 on 409 MW of net summer capacity, the 8th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 41 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Ash Creek Solar | 11% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Ash Creek Solar plant generating more or less than last year?
Ash Creek Solar generated 405,591 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 170.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 405,591 |
| 2026 through August | 660,256 |
| 2025, same months | 243,889 |
Monthly generation, Jun 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 111,047 |
| July 2026 | 113,191 |
| June 2026 | 91,732 |
| May 2026 | 84,284 |
| April 2026 | 57,927 |
| March 2026 | 75,451 |
| February 2026 | 70,227 |
| January 2026 | 56,397 |
| December 2025 | 35,134 |
| November 2025 | 49,673 |
| October 2025 | 38,067 |
| September 2025 | 38,828 |
| August 2025 | 81,331 |
| July 2025 | 82,094 |
| June 2025 | 80,464 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Ash Creek Solar plant, and when do they retire?
1 operable generator totals 409 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 409 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 78663 | Operating | Solar Photovoltaic | 409 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Ash Creek Solar plant?
EIA lists no joint owners for Ash Creek Solar. Ash Creek operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Ash Creek Solar plant?
Ash Creek Solar is in Abbott, Hill County, Texas, at 31.9008° N, 97.0337° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Ash Creek Solar's 409 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Mockingbird Solar Center | Lamar | 471 | 928,383 |
| Old 300 Solar Center, LLC | Fort Bend | 430 | 901,599 |
| 2W Permian Solar Project Hybrid | Andrews | 420 | 1,007,398 |
| Ash Creek Solar | Hill | 409 | 405,591 |
| Sequoia 1 | Eastland | 401 | 21,120 |
| Roadrunner, LLC Hybrid | Upton | 400 | 1,080,313 |
| Waco Solar | Limestone | 400 | 910,497 |
Source: EIA Forms EIA-860 and EIA-923, 2025.