Roadrunner, LLC Hybrid solar power plant, Texas

Roadrunner, LLC Hybrid is a 463 MW power plant, 400 MW of it solar, in Upton County, Texas, operated by Roadrunner Solar, LLC, and it generated 1,080,313 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 94th percentile of U.S. solar plants. By 2025 generation it ranks 703rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

463 MWNameplate capacity
31%Capacity factor, 2025, solar units, 94th percentile, on 400 MW net summer
0.2%Of TX generation, 2025
5 yearsAverage generator age, by MW

How hard does the Roadrunner, LLC Hybrid plant run compared with other solar plants?

The Roadrunner, LLC Hybrid plant's solar units had a capacity factor of 31% in 2025 on 400 MW of net summer capacity, the 94th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 113 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Roadrunner, LLC Hybrid31%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Roadrunner, LLC Hybrid plant generating more or less than last year?

Generation at Roadrunner, LLC Hybrid rose 7.2% from 2024 to 2025, from 1,007,544 MWh to 1,080,313 MWh. Through August 2026 it is running 7.3% behind the same months of 2025.

Net generation by period
PeriodMWh
20241,007,544
20251,080,313
2026 through August724,010
2025, same months781,316
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026119,500
July 2026114,627
June 202687,811
May 202697,296
April 202684,037
March 202688,778
February 202667,644
January 202664,317
December 202561,505
November 202565,831
October 202578,574
September 202593,087
August 2025111,850
July 2025116,084
June 2025105,741
May 2025111,653
April 202590,257
March 202593,702
February 202581,450
January 202570,579
December 202463,191
November 202470,254
October 202482,414
September 202491,586
August 2024117,898
July 2024114,080
June 2024104,737
May 202492,332
April 202470,442
March 202472,504
February 202465,939
January 202462,167

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Roadrunner, LLC Hybrid plant?

Roadrunner, LLC Hybrid made 0.2% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 115th largest of 1,023 plants in Texas, the 783rd largest of 14,327 in the U.S. and the 19th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 114th largest of 816 generating plants in the state.

Roadrunner, LLC Hybrid within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)463195,9660.2%
Generation (MWh)1,080,313592,896,1760.2%
Solar capacity (MW)40030,7391.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Roadrunner, LLC Hybrid plant, and when do they retire?

3 operable generators total 463 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120043%none reported
2020s226357%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
RODR1OperatingSolar Photovoltaic2002019n/a
RODR2OperatingSolar Photovoltaic2002020n/a
BAOperatingBatteries632023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Roadrunner, LLC Hybrid plant?

EIA lists no joint owners for Roadrunner, LLC Hybrid. Roadrunner Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Roadrunner, LLC Hybrid plant use?

Roadrunner, LLC Hybrid has capacity on 2 fuels: 86% solar and 14% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar40086.3%1,080,313
Battery and pumped storage6313.7%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Roadrunner, LLC Hybrid plant?

Roadrunner, LLC Hybrid is in McCamey, Upton County, Texas, at 31.2194° N, 102.1922° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Roadrunner, LLC Hybrid's 400 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
2W Permian Solar Project HybridAndrews4201,007,398
Ash Creek SolarHill409405,591
Sequoia 1Eastland40121,120
Roadrunner, LLC HybridUpton4001,080,313
Waco SolarLimestone400910,497
Red Tailed Hawk Solar LLCWharton360763,536
Five Wells Solar Center - HybridBell355738,178

Source: EIA Forms EIA-860 and EIA-923, 2025.