Solar power plant, Texas
Five Wells Solar Center-Hybrid power plant, Texas
Five Wells Solar Center-Hybrid is a 618 MW power plant, 355 MW of it solar, in Bell County, Texas, operated by Five Wells Solar Center, LLC, and it generated 722,551 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 73rd percentile of U.S. solar plants. By 2025 generation it ranks 964th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Five Wells Solar Center-Hybrid plant run compared with other solar plants?
The Five Wells Solar Center-Hybrid plant's solar units had a capacity factor of 26% in 2025 on 320 MW of net summer capacity, the 73rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Five Wells Solar Center-Hybrid | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Five Wells Solar Center-Hybrid plant generating more or less than last year?
Generation at Five Wells Solar Center-Hybrid rose 2.1% from 2024 to 2025, from 707,649 MWh to 722,551 MWh. Through August 2026 it is running 5.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 707,649 |
| 2025 | 722,551 |
| 2026 through August | 480,712 |
| 2025, same months | 507,617 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 83,747 |
| July 2026 | 81,757 |
| June 2026 | 68,652 |
| May 2026 | 48,795 |
| April 2026 | 42,816 |
| March 2026 | 64,308 |
| February 2026 | 50,696 |
| January 2026 | 39,941 |
| December 2025 | 33,318 |
| November 2025 | 46,750 |
| October 2025 | 63,549 |
| September 2025 | 71,317 |
| August 2025 | 76,351 |
| July 2025 | 70,648 |
| June 2025 | 79,638 |
| May 2025 | 71,566 |
| April 2025 | 63,330 |
| March 2025 | 65,451 |
| February 2025 | 40,701 |
| January 2025 | 39,932 |
| December 2024 | 37,302 |
| November 2024 | 44,823 |
| October 2024 | 65,654 |
| September 2024 | 65,943 |
| August 2024 | 86,071 |
| July 2024 | 82,162 |
| June 2024 | 64,742 |
| May 2024 | 55,253 |
| April 2024 | 58,526 |
| March 2024 | 56,765 |
| February 2024 | 47,957 |
| January 2024 | 42,451 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Five Wells Solar Center-Hybrid plant, and when do they retire?
2 operable generators total 618 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 618 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| FWSOL | Operating | Solar Photovoltaic | 355 | 2023 | n/a |
| FWBAT | Operating | Batteries | 263 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Five Wells Solar Center-Hybrid plant?
EIA lists no joint owners for Five Wells Solar Center-Hybrid. Five Wells Solar Center, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Five Wells Solar Center-Hybrid plant use?
Five Wells Solar Center-Hybrid has capacity on 2 fuels: 58% solar and 42% battery and pumped storage. In 2025, solar made 102% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 355 | 57.5% | 738,178 |
| Battery and pumped storage | 263 | 42.5% | -15,627 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Five Wells Solar Center-Hybrid plant?
Five Wells Solar Center-Hybrid is in Rogers, Bell County, Texas, at 30.9986° N, 97.2590° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Five Wells Solar Center-Hybrid's 355 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Roadrunner, LLC Hybrid | Upton | 400 | 1,080,313 |
| Waco Solar | Limestone | 400 | 910,497 |
| Red Tailed Hawk Solar LLC | Wharton | 360 | 763,536 |
| Five Wells Solar Center - Hybrid | Bell | 355 | 738,178 |
| Fagus Solar Park | Childress | 332 | n/a |
| Lumina II Solar Project | Scurry | 327 | 704,617 |
| Lumina Solar Project | Scurry | 327 | 686,678 |
Source: EIA Forms EIA-860 and EIA-923, 2025.