Markum Solar Farm is a 161 MW solar power plant in Bosque County, Texas, operated by Markum Solar Farm, LLC, and it generated 364,612 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 71st percentile of U.S. solar plants. By 2025 generation it ranks 1,714th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Markum Solar Farm plant run compared with other solar plants?
The Markum Solar Farm plant had a capacity factor of 26% in 2025 on 161 MW of net summer capacity, the 71st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 94 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Markum Solar Farm | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Markum Solar Farm plant generating more or less than last year?
Markum Solar Farm generated 364,612 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 3.0% ahead of the same months of 2025. 2024 has output for only 2 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 41,760 |
| 2025 | 364,612 |
| 2026 through August | 261,496 |
| 2025, same months | 253,900 |
Monthly generation, Nov 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 42,138 |
| July 2026 | 42,873 |
| June 2026 | 36,992 |
| May 2026 | 35,190 |
| April 2026 | 23,660 |
| March 2026 | 33,124 |
| February 2026 | 26,463 |
| January 2026 | 21,056 |
| December 2025 | 18,844 |
| November 2025 | 22,228 |
| October 2025 | 32,536 |
| September 2025 | 37,104 |
| August 2025 | 38,403 |
| July 2025 | 36,289 |
| June 2025 | 42,137 |
| May 2025 | 34,007 |
| April 2025 | 28,604 |
| March 2025 | 34,224 |
| February 2025 | 20,681 |
| January 2025 | 19,555 |
| December 2024 | 19,013 |
| November 2024 | 22,747 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Markum Solar Farm plant, and when do they retire?
1 operable generator totals 161 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 161 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MKM | Operating | Solar Photovoltaic | 161 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Markum Solar Farm plant?
EIA lists no joint owners for Markum Solar Farm. Markum Solar Farm, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Markum Solar Farm plant?
Markum Solar Farm is in Valley Mills, Bosque County, Texas, at 31.6948° N, 97.3749° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Markum Solar Farm's 161 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Azalea Springs Solar Park | Angelina | 180 | 239,942 |
| Swift Air Solar II | Ector | 174 | 33,850 |
| Concho Valley Solar, LLC | Tom Green | 173 | 303,594 |
| Markum Solar Farm | Bosque | 161 | 364,612 |
| RE Roserock | Pecos | 160 | 377,963 |
| Zier Solar | Kinney | 160 | 370,289 |
| BPL Files Solar | Hill | 158 | 224,744 |
Source: EIA Forms EIA-860 and EIA-923, 2025.