Solar power plant, Texas
Zier Solar power plant, Texas
Zier Solar is a 200 MW power plant, 160 MW of it solar, in Kinney County, Texas, operated by Cypress Creek Renewables, and it generated 364,394 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 74th percentile of U.S. solar plants. By 2025 generation it ranks 1,715th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Zier Solar plant run compared with other solar plants?
The Zier Solar plant's solar units had a capacity factor of 26% in 2025 on 160 MW of net summer capacity, the 74th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Zier Solar | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Zier Solar plant generating more or less than last year?
Zier Solar generated 364,394 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 9.0% behind the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 278,567 |
| 2025 | 364,394 |
| 2026 through August | 236,685 |
| 2025, same months | 260,039 |
Monthly generation, Apr 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 43,748 |
| July 2026 | 33,963 |
| June 2026 | 33,292 |
| May 2026 | 32,812 |
| April 2026 | 19,245 |
| March 2026 | 26,738 |
| February 2026 | 25,131 |
| January 2026 | 21,756 |
| December 2025 | 20,371 |
| November 2025 | 21,333 |
| October 2025 | 31,029 |
| September 2025 | 31,622 |
| August 2025 | 42,166 |
| July 2025 | 39,473 |
| June 2025 | 37,075 |
| May 2025 | 34,499 |
| April 2025 | 31,040 |
| March 2025 | 32,664 |
| February 2025 | 21,824 |
| January 2025 | 21,298 |
| December 2024 | 18,557 |
| November 2024 | 25,718 |
| October 2024 | 33,307 |
| September 2024 | 32,164 |
| August 2024 | 41,792 |
| July 2024 | 37,002 |
| June 2024 | 36,647 |
| May 2024 | 28,853 |
| April 2024 | 24,527 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Zier Solar plant, and when do they retire?
2 operable generators total 200 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 200 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 11023 | Operating | Batteries | 40 | 2024 | n/a |
| 41195 | Operating | Solar Photovoltaic | 160 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Zier Solar plant?
EIA lists no joint owners for Zier Solar. Cypress Creek Renewables operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Zier Solar plant use?
Zier Solar has capacity on 2 fuels: 80% solar and 20% battery and pumped storage. In 2025, solar made 102% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 160 | 79.8% | 370,289 |
| Battery and pumped storage | 40 | 20.2% | -5,895 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Zier Solar plant?
Zier Solar is in Brackettville, Kinney County, Texas, at 29.3510° N, 100.5620° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Zier Solar's 160 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Concho Valley Solar, LLC | Tom Green | 173 | 303,594 |
| Markum Solar Farm | Bosque | 161 | 364,612 |
| RE Roserock | Pecos | 160 | 377,963 |
| Zier Solar | Kinney | 160 | 370,289 |
| BPL Files Solar | Hill | 158 | 224,744 |
| Buckthorn Westex | Pecos | 154 | 356,578 |
| Felina | El Paso | 153 | 73,775 |
Source: EIA Forms EIA-860 and EIA-923, 2025.