Zier Solar is a 200 MW power plant, 160 MW of it solar, in Kinney County, Texas, operated by Cypress Creek Renewables, and it generated 364,394 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 74th percentile of U.S. solar plants. By 2025 generation it ranks 1,715th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
26%Capacity factor, 2025, solar units, 74th percentile, on 160 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Zier Solar plant run compared with other solar plants?

The Zier Solar plant's solar units had a capacity factor of 26% in 2025 on 160 MW of net summer capacity, the 74th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Zier Solar26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Zier Solar plant generating more or less than last year?

Zier Solar generated 364,394 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 9.0% behind the same months of 2025. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024278,567
2025364,394
2026 through August236,685
2025, same months260,039
Monthly generation, Apr 2024 to Aug 2026
MonthMWh
August 202643,748
July 202633,963
June 202633,292
May 202632,812
April 202619,245
March 202626,738
February 202625,131
January 202621,756
December 202520,371
November 202521,333
October 202531,029
September 202531,622
August 202542,166
July 202539,473
June 202537,075
May 202534,499
April 202531,040
March 202532,664
February 202521,824
January 202521,298
December 202418,557
November 202425,718
October 202433,307
September 202432,164
August 202441,792
July 202437,002
June 202436,647
May 202428,853
April 202424,527

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Zier Solar plant?

Zier Solar made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 296th largest of 1,023 plants in Texas, the 1,514th largest of 14,327 in the U.S. and the 243rd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 346th largest of 816 generating plants in the state.

Zier Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)364,394592,896,1760.1%
Solar capacity (MW)16030,7390.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Zier Solar plant, and when do they retire?

2 operable generators total 200 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2200100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
11023OperatingBatteries402024n/a
41195OperatingSolar Photovoltaic1602024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Zier Solar plant?

EIA lists no joint owners for Zier Solar. Cypress Creek Renewables operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Zier Solar plant use?

Zier Solar has capacity on 2 fuels: 80% solar and 20% battery and pumped storage. In 2025, solar made 102% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar16079.8%370,289
Battery and pumped storage4020.2%-5,895

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Zier Solar plant?

Zier Solar is in Brackettville, Kinney County, Texas, at 29.3510° N, 100.5620° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Zier Solar's 160 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Concho Valley Solar, LLCTom Green173303,594
Markum Solar FarmBosque161364,612
RE RoserockPecos160377,963
Zier SolarKinney160370,289
BPL Files SolarHill158224,744
Buckthorn WestexPecos154356,578
FelinaEl Paso15373,775