Skip to main content
RateWatt

Solar power plant, Texas

Buckthorn Westex solar power plant, Texas

Buckthorn Westex is a 154 MW solar power plant in Pecos County, Texas, operated by Buckthorn Westex, LLC, and it generated 356,578 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 74th percentile of U.S. solar plants. By 2025 generation it ranks 1,750th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

154 MWNameplate capacity
26%Capacity factor, 2025, 74th percentile, on 154 MW net summer
0.1%Of TX generation, 2025
7 yearsAverage generator age, by MW

How hard does the Buckthorn Westex plant run compared with other solar plants?

The Buckthorn Westex plant had a capacity factor of 26% in 2025 on 154 MW of net summer capacity, the 74th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Buckthorn Westex26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Buckthorn Westex plant generating more or less than last year?

Generation at Buckthorn Westex fell 5.2% from 2024 to 2025, from 376,097 MWh to 356,578 MWh. Through August 2026 it is running 15.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024376,097
2025356,578
2026 through August210,341
2025, same months247,583
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202644,714
July 202640,651
June 202622,868
May 202631,094
April 202620,600
March 202617,837
February 202615,662
January 202616,915
December 202519,791
November 202523,837
October 202530,127
September 202535,240
August 202541,830
July 202539,833
June 202532,713
May 202534,083
April 202527,820
March 202523,541
February 202527,197
January 202520,566
December 202420,431
November 202422,058
October 202430,597
September 202434,597
August 202460,044
July 202440,220
June 202436,913
May 202438,696
April 202426,351
March 202425,634
February 202419,309
January 202421,247

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Buckthorn Westex plant?

Buckthorn Westex made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 400th largest of 1,023 plants in Texas, the 1,935th largest of 14,327 in the U.S. and the 250th largest of 7,223 solar plants. By 2025 generation it is the 355th largest of 816 generating plants in the state.

Buckthorn Westex within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)154195,9660.1%
Generation (MWh)356,578592,896,1760.1%
Solar capacity (MW)15430,7390.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Buckthorn Westex plant, and when do they retire?

1 operable generator totals 154 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1154100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BKTH1OperatingSolar Photovoltaic1542018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Buckthorn Westex plant?

EIA lists no joint owners for Buckthorn Westex. Buckthorn Westex, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Buckthorn Westex plant?

Buckthorn Westex is in Ft. Stockton, Pecos County, Texas, at 30.5755° N, 102.5513° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Buckthorn Westex's 154 MW is 1% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
RE RoserockPecos160377,963
Zier SolarKinney160370,289
BPL Files SolarHill158224,744
Buckthorn WestexPecos154356,578
FelinaEl Paso15373,775
Ganado SolarJackson151347,695
Upton County SolarUpton150299,145

Source: EIA Forms EIA-860 and EIA-923, 2025.