Solar power plant, Texas
RE Roserock solar power plant, Texas
RE Roserock is a 160 MW solar power plant in Pecos County, Texas, operated by Southern Power Co, and it generated 377,963 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 80th percentile of U.S. solar plants. By 2025 generation it ranks 1,662nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the RE Roserock plant run compared with other solar plants?
The RE Roserock plant had a capacity factor of 27% in 2025 on 158 MW of net summer capacity, the 80th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| RE Roserock | 27% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the RE Roserock plant generating more or less than last year?
Generation at RE Roserock rose 3.3% from 2024 to 2025, from 365,758 MWh to 377,963 MWh. Through August 2026 it is running 4.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 365,758 |
| 2025 | 377,963 |
| 2026 through August | 256,577 |
| 2025, same months | 267,143 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 39,169 |
| July 2026 | 37,780 |
| June 2026 | 30,348 |
| May 2026 | 36,127 |
| April 2026 | 31,985 |
| March 2026 | 33,026 |
| February 2026 | 25,532 |
| January 2026 | 22,610 |
| December 2025 | 22,924 |
| November 2025 | 26,018 |
| October 2025 | 31,179 |
| September 2025 | 30,699 |
| August 2025 | 37,207 |
| July 2025 | 38,038 |
| June 2025 | 33,670 |
| May 2025 | 36,842 |
| April 2025 | 33,905 |
| March 2025 | 33,624 |
| February 2025 | 28,499 |
| January 2025 | 25,358 |
| December 2024 | 22,726 |
| November 2024 | 25,027 |
| October 2024 | 32,734 |
| September 2024 | 30,206 |
| August 2024 | 36,536 |
| July 2024 | 34,418 |
| June 2024 | 32,163 |
| May 2024 | 38,443 |
| April 2024 | 34,041 |
| March 2024 | 29,751 |
| February 2024 | 24,493 |
| January 2024 | 25,220 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the RE Roserock plant, and when do they retire?
1 operable generator totals 160 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 160 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ROSEK | Operating | Solar Photovoltaic | 160 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the RE Roserock plant?
RE Roserock is the only joint owner reported for RE Roserock, with 100.0%. Southern Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the RE Roserock plant?
RE Roserock is in Fort Stockton, Pecos County, Texas, at 30.9602° N, 103.3067° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and RE Roserock's 160 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Swift Air Solar II | Ector | 174 | 33,850 |
| Concho Valley Solar, LLC | Tom Green | 173 | 303,594 |
| Markum Solar Farm | Bosque | 161 | 364,612 |
| RE Roserock | Pecos | 160 | 377,963 |
| Zier Solar | Kinney | 160 | 370,289 |
| BPL Files Solar | Hill | 158 | 224,744 |
| Buckthorn Westex | Pecos | 154 | 356,578 |
Source: EIA Forms EIA-860 and EIA-923, 2025.