Solar power plant, Texas

Ganado Solar power plant, Texas

Ganado Solar is a 221 MW power plant, 151 MW of it solar, in Jackson County, Texas, operated by Enel Green Power NA, Inc., and it generated 339,942 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 73rd percentile of U.S. solar plants. By 2025 generation it ranks 1,811th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

221 MWNameplate capacity
26%Capacity factor, 2025, solar units, 73rd percentile, on 151 MW net summer
0.1%Of TX generation, 2025
2 yearsAverage generator age, by MW

How hard does the Ganado Solar plant run compared with other solar plants?

The Ganado Solar plant's solar units had a capacity factor of 26% in 2025 on 151 MW of net summer capacity, the 73rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 96 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Ganado Solar26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Ganado Solar plant generating more or less than last year?

Generation at Ganado Solar rose 4.4% from 2024 to 2025, from 325,541 MWh to 339,942 MWh. Through August 2026 it is running 3.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024325,541
2025339,942
2026 through August228,205
2025, same months235,652
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202637,603
July 202635,648
June 202631,119
May 202627,611
April 202622,881
March 202630,752
February 202623,054
January 202619,537
December 202518,001
November 202523,290
October 202529,508
September 202533,491
August 202535,604
July 202534,766
June 202534,229
May 202534,198
April 202529,518
March 202531,858
February 202519,342
January 202516,137
December 202418,485
November 202423,484
October 202432,731
September 202428,806
August 202433,792
July 202428,219
June 202437,485
May 202427,426
April 202429,057
March 202425,370
February 202423,483
January 202417,203

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Ganado Solar plant?

Ganado Solar made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 260th largest of 1,023 plants in Texas, the 1,401st largest of 14,327 in the U.S. and the 258th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 368th largest of 816 generating plants in the state.

Ganado Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)221195,9660.1%
Generation (MWh)339,942592,896,1760.1%
Solar capacity (MW)15130,7390.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Ganado Solar plant, and when do they retire?

2 operable generators total 221 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2221100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GS1OperatingSolar Photovoltaic1512023n/a
GBAOperatingBatteries712024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Ganado Solar plant?

EIA lists no joint owners for Ganado Solar. Enel Green Power NA, Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Ganado Solar plant use?

Ganado Solar has capacity on 2 fuels: 68% solar and 32% battery and pumped storage. In 2025, solar made 102% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar15168.1%347,695
Battery and pumped storage7131.9%-7,753

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Ganado Solar plant?

Ganado Solar is in Gail, Jackson County, Texas, at 29.1091° N, 96.5288° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Ganado Solar's 151 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
BPL Files SolarHill158224,744
Buckthorn WestexPecos154356,578
FelinaEl Paso15373,775
Ganado SolarJackson151347,695
Upton County SolarUpton150299,145
Oberon IAEctor150302,685
Crane Solar ProjectCrane150405,477

Source: EIA Forms EIA-860 and EIA-923, 2025.