Solar power plant, Texas
Crane Solar Project, Texas
Crane Solar Project is a 150 MW solar power plant in Crane County, Texas, operated by Crane Solar Project, LLC, and it generated 405,477 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 94th percentile of U.S. solar plants. By 2025 generation it ranks 1,575th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Crane Solar Project plant run compared with other solar plants?
The Crane Solar Project plant had a capacity factor of 31% in 2025 on 150 MW of net summer capacity, the 94th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 113 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Crane Solar Project | 31% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Crane Solar Project plant generating more or less than last year?
Generation at Crane Solar Project fell 1.1% from 2024 to 2025, from 409,900 MWh to 405,477 MWh. Through August 2026 it is running 6.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 409,900 |
| 2025 | 405,477 |
| 2026 through August | 269,970 |
| 2025, same months | 288,131 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 40,918 |
| July 2026 | 40,495 |
| June 2026 | 31,442 |
| May 2026 | 36,750 |
| April 2026 | 33,192 |
| March 2026 | 35,094 |
| February 2026 | 27,455 |
| January 2026 | 24,624 |
| December 2025 | 23,373 |
| November 2025 | 26,551 |
| October 2025 | 32,855 |
| September 2025 | 34,567 |
| August 2025 | 41,184 |
| July 2025 | 38,324 |
| June 2025 | 41,143 |
| May 2025 | 42,713 |
| April 2025 | 35,900 |
| March 2025 | 32,424 |
| February 2025 | 29,168 |
| January 2025 | 27,275 |
| December 2024 | 24,986 |
| November 2024 | 27,350 |
| October 2024 | 32,810 |
| September 2024 | 35,633 |
| August 2024 | 37,393 |
| July 2024 | 44,117 |
| June 2024 | 44,185 |
| May 2024 | 42,315 |
| April 2024 | 34,095 |
| March 2024 | 32,960 |
| February 2024 | 27,945 |
| January 2024 | 26,111 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Crane Solar Project plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CRN1 | Operating | Solar Photovoltaic | 150 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Crane Solar Project plant?
EIA lists no joint owners for Crane Solar Project. Crane Solar Project, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Crane Solar Project plant?
Crane Solar Project is in Crane, Crane County, Texas, at 31.2544° N, 102.3117° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Crane Solar Project's 150 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Ganado Solar | Jackson | 151 | 347,695 |
| Upton County Solar | Upton | 150 | 299,145 |
| Oberon IA | Ector | 150 | 302,685 |
| Crane Solar Project | Crane | 150 | 405,477 |
| Umbriel Solar | Polk | 150 | 318,883 |
| Copperhead Solar, LLC | McLennan | 150 | 300,799 |
| Peacock Energy Project | San Patricio | 150 | 307,244 |
Source: EIA Forms EIA-860 and EIA-923, 2025.