Solar power plant, Texas
Peacock Energy Project, Texas
Peacock Energy Project is a 150 MW solar power plant in San Patricio County, Texas, operated by Lightsource Renewable Energy Asset Management, LLC, and it generated 307,244 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 52nd percentile of U.S. solar plants. By 2025 generation it ranks 1,941st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Peacock Energy Project plant run compared with other solar plants?
The Peacock Energy Project plant had a capacity factor of 23% in 2025 on 150 MW of net summer capacity, the 52nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Peacock Energy Project | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Peacock Energy Project plant generating more or less than last year?
Peacock Energy Project generated 307,244 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 9.2% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 11,843 |
| 2025 | 307,244 |
| 2026 through August | 231,271 |
| 2025, same months | 211,690 |
Monthly generation, Dec 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 38,933 |
| July 2026 | 36,889 |
| June 2026 | 29,558 |
| May 2026 | 30,152 |
| April 2026 | 21,747 |
| March 2026 | 31,803 |
| February 2026 | 23,763 |
| January 2026 | 18,426 |
| December 2025 | 15,147 |
| November 2025 | 21,745 |
| October 2025 | 30,080 |
| September 2025 | 28,582 |
| August 2025 | 33,649 |
| July 2025 | 31,257 |
| June 2025 | 31,875 |
| May 2025 | 34,286 |
| April 2025 | 23,870 |
| March 2025 | 25,593 |
| February 2025 | 18,343 |
| January 2025 | 12,817 |
| December 2024 | 11,843 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Peacock Energy Project plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TXPC1 | Operating | Solar Photovoltaic | 150 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Peacock Energy Project plant?
EIA lists no joint owners for Peacock Energy Project. Lightsource Renewable Energy Asset Management, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Peacock Energy Project plant?
Peacock Energy Project is in Taft, San Patricio County, Texas, at 28.0004° N, 97.3879° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Peacock Energy Project's 150 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Crane Solar Project | Crane | 150 | 405,477 |
| Umbriel Solar | Polk | 150 | 318,883 |
| Copperhead Solar, LLC | McLennan | 150 | 300,799 |
| Peacock Energy Project | San Patricio | 150 | 307,244 |
| Lily Solar Hybrid | Kaufman | 147 | 320,782 |
| Swift Air Solar I | Ector | 145 | 311,507 |
| East Blackland Solar Project 1 | Travis | 144 | 277,344 |
Source: EIA Forms EIA-860 and EIA-923, 2025.