Skip to main content
RateWatt

Solar power plant, Texas

East Blackland Solar Project 1 power plant, Texas

East Blackland Solar Project 1 is a 144 MW solar power plant in Travis County, Texas, operated by Deriva Energy, and it generated 277,344 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 40th percentile of U.S. solar plants. By 2025 generation it ranks 2,070th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

144 MWNameplate capacity
22%Capacity factor, 2025, 40th percentile, on 144 MW net summer
2,070thU.S. rank by generation, 2025
4 yearsAverage generator age, by MW

How hard does the East Blackland Solar Project 1 plant run compared with other solar plants?

The East Blackland Solar Project 1 plant had a capacity factor of 22% in 2025 on 144 MW of net summer capacity, the 40th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 80 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
East Blackland Solar Project 122%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the East Blackland Solar Project 1 plant generating more or less than last year?

Generation at East Blackland Solar Project 1 rose 2.0% from 2024 to 2025, from 271,896 MWh to 277,344 MWh. Through August 2026 it is running 3.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024271,896
2025277,344
2026 through August196,817
2025, same months191,157
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202636,897
July 202634,881
June 202630,620
May 202628,433
April 202619,520
March 202621,944
February 202612,835
January 202611,687
December 202513,407
November 202517,554
October 202526,774
September 202528,452
August 202535,321
July 202526,521
June 202533,419
May 202529,629
April 202524,587
March 202517,867
February 202512,835
January 202510,978
December 20249,350
November 202416,609
October 202423,751
September 202425,475
August 202431,302
July 202431,401
June 202431,137
May 202424,080
April 202422,071
March 202419,737
February 202421,269
January 202415,714

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the East Blackland Solar Project 1 plant?

East Blackland Solar Project 1 made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 439th largest of 1,023 plants in Texas, the 2,112th largest of 14,327 in the U.S. and the 322nd largest of 7,223 solar plants. By 2025 generation it is the 401st largest of 816 generating plants in the state.

East Blackland Solar Project 1 within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)144195,9660.1%
Generation (MWh)277,344592,896,1760.0%
Solar capacity (MW)14430,7390.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the East Blackland Solar Project 1 plant, and when do they retire?

1 operable generator totals 144 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1144100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PSFOperatingSolar Photovoltaic1442021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the East Blackland Solar Project 1 plant?

EIA lists no joint owners for East Blackland Solar Project 1. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the East Blackland Solar Project 1 plant?

East Blackland Solar Project 1 is in Manor, Travis County, Texas, at 30.4214° N, 97.4614° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and East Blackland Solar Project 1's 144 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Peacock Energy ProjectSan Patricio150307,244
Lily Solar HybridKaufman147320,782
Swift Air Solar IEctor145311,507
East Blackland Solar Project 1Travis144277,344
Starr Solar RanchStarr136272,169
Nebula SolarCameron135291,345
Elm Branch Solar 1Ellis135253,009

Source: EIA Forms EIA-860 and EIA-923, 2025.