Solar power plant, Texas
Nebula Solar power plant, Texas
Nebula Solar is a 135 MW solar power plant in Cameron County, Texas, operated by Rayos del Sol Solar Project, LLC, and it generated 291,345 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 62nd percentile of U.S. solar plants. By 2025 generation it ranks 2,018th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Nebula Solar plant run compared with other solar plants?
The Nebula Solar plant had a capacity factor of 25% in 2025 on 135 MW of net summer capacity, the 62nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Nebula Solar | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Nebula Solar plant generating more or less than last year?
Generation at Nebula Solar rose 14.5% from 2024 to 2025, from 254,448 MWh to 291,345 MWh. Through August 2026 it is running 6.5% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 254,448 |
| 2025 | 291,345 |
| 2026 through August | 207,826 |
| 2025, same months | 195,208 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 30,757 |
| July 2026 | 25,631 |
| June 2026 | 31,357 |
| May 2026 | 27,861 |
| April 2026 | 15,706 |
| March 2026 | 33,758 |
| February 2026 | 23,291 |
| January 2026 | 19,465 |
| December 2025 | 15,600 |
| November 2025 | 21,918 |
| October 2025 | 29,444 |
| September 2025 | 29,175 |
| August 2025 | 34,362 |
| July 2025 | 34,179 |
| June 2025 | 26,438 |
| May 2025 | 26,252 |
| April 2025 | 18,842 |
| March 2025 | 25,406 |
| February 2025 | 15,805 |
| January 2025 | 13,924 |
| December 2024 | 14,561 |
| November 2024 | 20,131 |
| October 2024 | 21,613 |
| September 2024 | 21,461 |
| August 2024 | 9,466 |
| July 2024 | 30,016 |
| June 2024 | 32,192 |
| May 2024 | 26,595 |
| April 2024 | 23,487 |
| March 2024 | 20,929 |
| February 2024 | 18,641 |
| January 2024 | 15,356 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Nebula Solar plant, and when do they retire?
1 operable generator totals 135 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 135 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| NEB1 | Operating | Solar Photovoltaic | 135 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Nebula Solar plant?
EIA lists no joint owners for Nebula Solar. Rayos del Sol Solar Project, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Nebula Solar plant?
Nebula Solar is in La Feria, Cameron County, Texas, at 26.0901° N, 97.7985° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Nebula Solar's 135 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Swift Air Solar I | Ector | 145 | 311,507 |
| East Blackland Solar Project 1 | Travis | 144 | 277,344 |
| Starr Solar Ranch | Starr | 136 | 272,169 |
| Nebula Solar | Cameron | 135 | 291,345 |
| Elm Branch Solar 1 | Ellis | 135 | 253,009 |
| Elara Solar | Frio | 132 | 265,557 |
| Orange Grove | Jim Wells | 131 | 172,584 |
Source: EIA Forms EIA-860 and EIA-923, 2025.