Solar power plant, Texas
Orange Grove solar power plant, Texas
Orange Grove is a 131 MW solar power plant in Jim Wells County, Texas, operated by Orange Grove, and it generated 172,584 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 12th percentile of U.S. solar plants. By 2025 generation it ranks 2,699th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Orange Grove plant run compared with other solar plants?
The Orange Grove plant had a capacity factor of 15% in 2025 on 131 MW of net summer capacity, the 12th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 55 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Orange Grove | 15% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Orange Grove plant generating more or less than last year?
Orange Grove generated 172,584 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 144.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 172,584 |
| 2026 through August | 230,152 |
| 2025, same months | 94,340 |
Monthly generation, Jun 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 37,518 |
| July 2026 | 36,320 |
| June 2026 | 31,114 |
| May 2026 | 32,598 |
| April 2026 | 21,031 |
| March 2026 | 31,592 |
| February 2026 | 21,443 |
| January 2026 | 18,536 |
| December 2025 | 16,822 |
| November 2025 | 17,696 |
| October 2025 | 25,196 |
| September 2025 | 18,530 |
| August 2025 | 30,864 |
| July 2025 | 32,895 |
| June 2025 | 30,581 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Orange Grove plant, and when do they retire?
1 operable generator totals 131 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 131 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TALPV | Operating | Solar Photovoltaic | 131 | 2025 | n/a |
| TALBS | Cancelled | Batteries | 61 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Orange Grove plant?
EIA lists no joint owners for Orange Grove. Orange Grove operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Orange Grove plant?
Orange Grove is in Jim Wells, Jim Wells County, Texas, at 27.9183° N, 97.9805° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Orange Grove's 131 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Nebula Solar | Cameron | 135 | 291,345 |
| Elm Branch Solar 1 | Ellis | 135 | 253,009 |
| Elara Solar | Frio | 132 | 265,557 |
| Orange Grove | Jim Wells | 131 | 172,584 |
| Briar Creek Solar 1 | Navarro | 127 | 219,455 |
| Norton Solar Farm | Runnels | 125 | 59,847 |
| Coniglio Solar | Fannin | 124 | 205,760 |
Source: EIA Forms EIA-860 and EIA-923, 2025.