Solar power plant, Texas
Elara Solar power plant, Texas
Elara Solar is a 132 MW solar power plant in Frio County, Texas, operated by Elara Energy Holdings, LLC, and it generated 265,557 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 52nd percentile of U.S. solar plants. By 2025 generation it ranks 2,133rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Elara Solar plant run compared with other solar plants?
The Elara Solar plant had a capacity factor of 23% in 2025 on 130 MW of net summer capacity, the 52nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 85 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Elara Solar | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Elara Solar plant generating more or less than last year?
Generation at Elara Solar rose 8.8% from 2024 to 2025, from 244,043 MWh to 265,557 MWh. Through August 2026 it is running 0.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 244,043 |
| 2025 | 265,557 |
| 2026 through August | 181,083 |
| 2025, same months | 179,486 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 33,138 |
| July 2026 | 29,662 |
| June 2026 | 26,640 |
| May 2026 | 26,861 |
| April 2026 | 16,057 |
| March 2026 | 18,750 |
| February 2026 | 15,648 |
| January 2026 | 14,327 |
| December 2025 | 14,459 |
| November 2025 | 18,496 |
| October 2025 | 26,765 |
| September 2025 | 26,351 |
| August 2025 | 32,193 |
| July 2025 | 27,258 |
| June 2025 | 26,320 |
| May 2025 | 25,716 |
| April 2025 | 17,051 |
| March 2025 | 20,196 |
| February 2025 | 16,434 |
| January 2025 | 14,318 |
| December 2024 | 13,783 |
| November 2024 | 18,888 |
| October 2024 | 17,644 |
| September 2024 | 19,589 |
| August 2024 | 23,529 |
| July 2024 | 28,377 |
| June 2024 | 28,892 |
| May 2024 | 19,589 |
| April 2024 | 21,959 |
| March 2024 | 17,131 |
| February 2024 | 17,823 |
| January 2024 | 16,839 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Elara Solar plant, and when do they retire?
1 operable generator totals 132 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 132 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ELARA | Operating | Solar Photovoltaic | 132 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Elara Solar plant?
Elara Energy Project, LLC is the only joint owner reported for Elara Solar, with 100.0%. Elara Energy Holdings, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Elara Solar plant?
Elara Solar is in Pearsall, Frio County, Texas, at 28.8832° N, 99.1786° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Elara Solar's 132 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Starr Solar Ranch | Starr | 136 | 272,169 |
| Nebula Solar | Cameron | 135 | 291,345 |
| Elm Branch Solar 1 | Ellis | 135 | 253,009 |
| Elara Solar | Frio | 132 | 265,557 |
| Orange Grove | Jim Wells | 131 | 172,584 |
| Briar Creek Solar 1 | Navarro | 127 | 219,455 |
| Norton Solar Farm | Runnels | 125 | 59,847 |
Source: EIA Forms EIA-860 and EIA-923, 2025.