Solar power plant, Texas
Elm Branch Solar 1 power plant, Texas
Elm Branch Solar 1 is a 135 MW solar power plant in Ellis County, Texas, operated by Lightsource Renewable Energy Asset Management, LLC, and it generated 253,009 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 36th percentile of U.S. solar plants. By 2025 generation it ranks 2,212th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Elm Branch Solar 1 plant run compared with other solar plants?
The Elm Branch Solar 1 plant had a capacity factor of 21% in 2025 on 135 MW of net summer capacity, the 36th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Elm Branch Solar 1 | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Elm Branch Solar 1 plant generating more or less than last year?
Generation at Elm Branch Solar 1 fell 4.6% from 2024 to 2025, from 265,324 MWh to 253,009 MWh. Through August 2026 it is running 0.8% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 265,324 |
| 2025 | 253,009 |
| 2026 through August | 175,446 |
| 2025, same months | 176,786 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 32,006 |
| July 2026 | 32,515 |
| June 2026 | 27,994 |
| May 2026 | 25,936 |
| April 2026 | 14,979 |
| March 2026 | 19,267 |
| February 2026 | 10,835 |
| January 2026 | 11,914 |
| December 2025 | 11,912 |
| November 2025 | 16,571 |
| October 2025 | 20,936 |
| September 2025 | 26,804 |
| August 2025 | 29,021 |
| July 2025 | 30,098 |
| June 2025 | 26,950 |
| May 2025 | 25,446 |
| April 2025 | 21,918 |
| March 2025 | 17,744 |
| February 2025 | 13,757 |
| January 2025 | 11,852 |
| December 2024 | 10,916 |
| November 2024 | 15,141 |
| October 2024 | 25,851 |
| September 2024 | 25,724 |
| August 2024 | 33,225 |
| July 2024 | 31,323 |
| June 2024 | 32,026 |
| May 2024 | 22,115 |
| April 2024 | 19,017 |
| March 2024 | 20,844 |
| February 2024 | 15,193 |
| January 2024 | 13,949 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Elm Branch Solar 1 plant, and when do they retire?
1 operable generator totals 135 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 135 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TXEB1 | Operating | Solar Photovoltaic | 135 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Elm Branch Solar 1 plant?
Elm Branch Solar 1, LLC is the only joint owner reported for Elm Branch Solar 1, with 100.0%. Lightsource Renewable Energy Asset Management, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Elm Branch Solar 1 plant?
Elm Branch Solar 1 is in Ennis, Ellis County, Texas, at 32.2326° N, 96.7061° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Elm Branch Solar 1's 135 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| East Blackland Solar Project 1 | Travis | 144 | 277,344 |
| Starr Solar Ranch | Starr | 136 | 272,169 |
| Nebula Solar | Cameron | 135 | 291,345 |
| Elm Branch Solar 1 | Ellis | 135 | 253,009 |
| Elara Solar | Frio | 132 | 265,557 |
| Orange Grove | Jim Wells | 131 | 172,584 |
| Briar Creek Solar 1 | Navarro | 127 | 219,455 |
Source: EIA Forms EIA-860 and EIA-923, 2025.