Coniglio Solar is a 124 MW solar power plant in Fannin County, Texas, operated by BT Coniglio Solar LLC, and it generated 205,760 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 20th percentile of U.S. solar plants. By 2025 generation it ranks 2,451st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Coniglio Solar plant run compared with other solar plants?
The Coniglio Solar plant had a capacity factor of 19% in 2025 on 124 MW of net summer capacity, the 20th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 69 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Coniglio Solar | 19% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Coniglio Solar plant generating more or less than last year?
Coniglio Solar generated 205,760 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.5% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 197,147 |
| 2025 | 205,760 |
| 2026 through August | 150,098 |
| 2025, same months | 142,321 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 25,462 |
| July 2026 | 27,249 |
| June 2026 | 17,674 |
| May 2026 | 19,449 |
| April 2026 | 16,636 |
| March 2026 | 18,340 |
| February 2026 | 14,180 |
| January 2026 | 11,108 |
| December 2025 | 10,787 |
| November 2025 | 13,506 |
| October 2025 | 17,831 |
| September 2025 | 21,315 |
| August 2025 | 20,725 |
| July 2025 | 24,230 |
| June 2025 | 22,977 |
| May 2025 | 17,467 |
| April 2025 | 17,235 |
| March 2025 | 16,827 |
| February 2025 | 11,788 |
| January 2025 | 11,072 |
| December 2024 | 8,205 |
| November 2024 | 12,642 |
| October 2024 | 20,109 |
| September 2024 | 19,573 |
| August 2024 | 25,190 |
| July 2024 | 22,054 |
| June 2024 | 26,414 |
| May 2024 | 20,259 |
| April 2024 | 0 |
| March 2024 | 14,143 |
| February 2024 | 17,037 |
| January 2024 | 11,521 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Coniglio Solar plant, and when do they retire?
1 operable generator totals 124 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 124 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BTCON | Operating | Solar Photovoltaic | 124 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Coniglio Solar plant?
EIA lists no joint owners for Coniglio Solar. BT Coniglio Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Coniglio Solar plant?
Coniglio Solar is in Wolfe City, Fannin County, Texas, at 33.4045° N, 96.0825° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Coniglio Solar's 124 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Orange Grove | Jim Wells | 131 | 172,584 |
| Briar Creek Solar 1 | Navarro | 127 | 219,455 |
| Norton Solar Farm | Runnels | 125 | 59,847 |
| Coniglio Solar | Fannin | 124 | 205,760 |
| Wagyu | Brazoria | 120 | 235,421 |
| Long Point Solar | Brazoria | 120 | 429 |
| East Pecos Solar | Pecos | 119 | 219,423 |
Source: EIA Forms EIA-860 and EIA-923, 2025.