Long Point Solar power plant, Texas

Long Point Solar is a 120 MW solar power plant in Brazoria County, Texas, operated by MN8 Energy LLC, and it generated 429 MWh in 2025 (Forms EIA-860 and EIA-923). By 2025 generation it ranks 12,161st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

120 MWNameplate capacity
under 1%Capacity factor, 2025, on 120 MW net summer
12,161stU.S. rank by generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Long Point Solar plant run compared with other solar plants?

The Long Point Solar plant had a capacity factor of under 1% in 2025 on 120 MW of net summer capacity, below nearly all of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Long Point Solarunder 1%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Long Point Solar plant generating more or less than last year?

Long Point Solar generated 429 MWh in 2025; EIA reports no 2024 total to compare.

Net generation by period
PeriodMWh
2024n/a
2025429
2026 through August184,796
Monthly generation, Dec 2025 to Aug 2026
MonthMWh
August 202632,435
July 202629,326
June 202626,740
May 202623,806
April 202619,779
March 202624,165
February 202617,082
January 202611,463
December 2025429

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Long Point Solar plant?

Long Point Solar made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 468th largest of 1,023 plants in Texas, the 2,315th largest of 14,327 in the U.S. and the 387th largest of 7,223 solar plants. By 2025 generation it is the 674th largest of 816 generating plants in the state.

Long Point Solar within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)120195,9660.1%
Generation (MWh)429592,896,1760.0%
Solar capacity (MW)12030,7390.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Long Point Solar plant, and when do they retire?

1 operable generator totals 120 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingSolar Photovoltaic1202025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Long Point Solar plant?

Long Point Solar, LLC is the only joint owner reported for Long Point Solar, with 100.0%. MN8 Energy LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Long Point Solar plant?

Long Point Solar is in Damon, Brazoria County, Texas, at 29.2440° N, 95.6760° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Texas are similar in size?

Texas has 225 operable solar plants with 30,739 MW of capacity, and Long Point Solar's 120 MW is 0% of that.

Solar plants in Texas around this size
PlantCountyMW2025 MWh
Norton Solar FarmRunnels12559,847
Coniglio SolarFannin124205,760
WagyuBrazoria120235,421
Long Point SolarBrazoria120429
East Pecos SolarPecos119219,423
Bluebell Solar IISterling115254,548
Cutlass Solar 1 LLCFort Bend111168,963