Solar power plant, Texas
Cutlass Solar 1 LLC power plant, Texas
Cutlass Solar 1 LLC is a 111 MW solar power plant in Fort Bend County, Texas, operated by Cutlass Solar 1, LLC, and it generated 168,963 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 15th percentile of U.S. solar plants. By 2025 generation it ranks 2,725th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Cutlass Solar 1 LLC plant run compared with other solar plants?
The Cutlass Solar 1 LLC plant had a capacity factor of 17% in 2025 on 111 MW of net summer capacity, the 15th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 63 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Cutlass Solar 1 LLC | 17% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Cutlass Solar 1 LLC plant generating more or less than last year?
Generation at Cutlass Solar 1 LLC fell 21.0% from 2024 to 2025, from 213,774 MWh to 168,963 MWh. Through August 2026 it is running 9.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 213,774 |
| 2025 | 168,963 |
| 2026 through August | 118,375 |
| 2025, same months | 108,286 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 18,429 |
| July 2026 | 18,919 |
| June 2026 | 17,459 |
| May 2026 | 13,617 |
| April 2026 | 13,777 |
| March 2026 | 14,625 |
| February 2026 | 12,470 |
| January 2026 | 9,079 |
| December 2025 | 10,368 |
| November 2025 | 13,864 |
| October 2025 | 18,438 |
| September 2025 | 18,007 |
| August 2025 | 21,139 |
| July 2025 | 19,136 |
| June 2025 | 17,052 |
| May 2025 | 8,180 |
| April 2025 | 13,219 |
| March 2025 | 12,895 |
| February 2025 | 7,932 |
| January 2025 | 8,733 |
| December 2024 | 11,110 |
| November 2024 | 14,550 |
| October 2024 | 19,268 |
| September 2024 | 19,319 |
| August 2024 | 24,645 |
| July 2024 | 20,312 |
| June 2024 | 25,452 |
| May 2024 | 19,014 |
| April 2024 | 17,644 |
| March 2024 | 14,804 |
| February 2024 | 15,147 |
| January 2024 | 12,509 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Cutlass Solar 1 LLC plant, and when do they retire?
1 operable generator totals 111 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 111 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CT1PV | Operating | Solar Photovoltaic | 111 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Cutlass Solar 1 LLC plant?
3 owners report shares in Cutlass Solar 1 LLC; Eneos Renewable Energy USA LLC holds the largest named share, 49.9% or about 55.3 MW. Cutlass Solar 1, LLC operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Eneos Renewable Energy USA LLC | 49.9% | 55 | 84,313 |
| Fuyo General Lease (USA) Inc | 36.3% | 40 | 61,317 |
| AP Cutlass Holdings LLC | 13.8% | 15 | 23,334 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Cutlass Solar 1 LLC plant?
Cutlass Solar 1 LLC is in Richmond, Fort Bend County, Texas, at 29.4097° N, 95.7340° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Cutlass Solar 1 LLC's 111 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Long Point Solar | Brazoria | 120 | 429 |
| East Pecos Solar | Pecos | 119 | 219,423 |
| Bluebell Solar II | Sterling | 115 | 254,548 |
| Cutlass Solar 1 LLC | Fort Bend | 111 | 168,963 |
| Galloway 2 Solar Farm | Concho | 110 | 246,701 |
| Liberty County Solar Project | Liberty | 110 | 245,415 |
| Emerald Grove | Pecos | 108 | 256,324 |
Source: EIA Forms EIA-860 and EIA-923, 2025.